SMC clears double level flyover, railway over bridge projects
April 06, 2013
By our correspondent, Surat, 6 April 2013
Surat-Dumas road will get a double level flyover bridge at a cost of Rs 30.91 crore.
Surat Municipal Corporation(SMC)’s Standing Committee meeting on Friday approved the tender of this project.
Vehicles from cable stayed bridge(under construction) will come to Pal side and from lower level go to Parle point. Vehicles coming from Athwa gate will reach directly to cable stayed bridge through this over bridge. Proposed flyover bridge will be 800-900 meter in length.
In another development, Surat Municipal Corporation’s Standing Committee meeting approved construction of Bhestan railway over bridge.
Recent Stories
- Group clash in Vastrapur gam in Ahmedabad; One death, seven injured
- ACB Gujarat nabs female drug inspector in a bribe case
- Meal for Rs. 20 ; Railways open economical meal counters at Bharuch and Vadodara stations
- Virtual Traffic Court sent notices to 1.57 lakh motorists; only 9,420 paid fines
- Lok Sabha Polls: PM Modi likely to visit Gujarat on May 1-2
- Gujarat CM to visit Telangana on April 25 for Lok Sabha poll campaign
- Parimal Nathwani unveils trophy of first ever Gujarat Super League