In pictures: AMC – SRFDCL board meeting approves foot bridge over river Sabarmati

Ahmedabad: The Ahmedabad Municipal Corporation(AMC) – Sabarmati River Front Development Corporation Limited(SRFDCL) Board meeting today approved the awarding of Iconic Foot Over Bridge across Sabarmati River between VIvekanand and Sardar Bridge. The length of the bridge shall be 300 m, width 10 m to 14 m. It will have approaches from upper and lower walkway. The bridge will have steel super structure, three spans. The project cost shall be Rs 74 crores. Duration of completion of the project after start will be 18 months.