In pictures: AMC – SRFDCL board meeting approves foot bridge over river Sabarmati
March 21, 2018
Ahmedabad: The Ahmedabad Municipal Corporation(AMC) – Sabarmati River Front Development Corporation Limited(SRFDCL) Board meeting today approved the awarding of Iconic Foot Over Bridge across Sabarmati River between VIvekanand and Sardar Bridge. The length of the bridge shall be 300 m, width 10 m to 14 m. It will have approaches from upper and lower walkway. The bridge will have steel super structure, three spans. The project cost shall be Rs 74 crores. Duration of completion of the project after start will be 18 months.
Related Stories
PM Modi to inaugurate Atal Pedestrian River Bridge at Sabarmati Riverfront
In photos: Colorful beautification ahead of opening of foot river bridge over Sabarmati
Iconic foot-over bridge over river Sabarmati likely to be commissioned next December
In photos: A new river bridge for walkers only under construction at Sabarmati Riverfront
Foundation stone for foot over bridge over river Sabarmati to be laid tomorrow
Recent Stories
- Meghraj observes bandh against withdrawal of BJP ticket to Bikhaji Thakor; Patil holds meeting
- BJP announces candidates for five-seat Gujarat Assembly by-polls
- AIMIM to contest Lok Sabha polls from Gandhinagar and Bharuch seats
- RTI activist booked for extortion in Chhota Udepur
- 3 dead in collision between ambulance and truck on Rajkot-Chotila Highway
- Okha to get Hovercraft Maintenance Unit, Jetty for Coast Guard
- Certificate for Garba's inscription in UNESCO's Intangible Cultural Heritage List bestowed upon Gujarat