In pictures: AMC – SRFDCL board meeting approves foot bridge over river Sabarmati
March 21, 2018
Ahmedabad: The Ahmedabad Municipal Corporation(AMC) – Sabarmati River Front Development Corporation Limited(SRFDCL) Board meeting today approved the awarding of Iconic Foot Over Bridge across Sabarmati River between VIvekanand and Sardar Bridge. The length of the bridge shall be 300 m, width 10 m to 14 m. It will have approaches from upper and lower walkway. The bridge will have steel super structure, three spans. The project cost shall be Rs 74 crores. Duration of completion of the project after start will be 18 months.
Related Stories
PM Modi to inaugurate Atal Pedestrian River Bridge at Sabarmati Riverfront
In photos: Colorful beautification ahead of opening of foot river bridge over Sabarmati
Iconic foot-over bridge over river Sabarmati likely to be commissioned next December
In photos: A new river bridge for walkers only under construction at Sabarmati Riverfront
Foundation stone for foot over bridge over river Sabarmati to be laid tomorrow
Recent Stories
- Gujarat govt to form AI Task Force
- Khambhat police book 31 for attacking police personnel
- BJP wins Vav assembly by-election in Banaskantha
- Progress update of Vadodara - Dahod - MP Border section of Delhi-Mumbai Expressway
- Thaltej Gam Metro Station ready; likely to open in December 2024
- Over 5 lakh tourists visit Rani ki Vav in Gujarat in two years
- Vav Assembly seat by-election 2024 live results