Survey work for new Narmada river bridge to begin soon


Bharuch, 8 September 2013

Lately, the project to build a new Narmada river bridge connecting Ankleshwar and Bharuch is seeing some movement.

According to local MLA Dushyant Patel, an order for survey, investigation and documentation to construct a new river bridge over Narmada has been issued on 6 September 2013. Mumbai based Spectrum technology has been assigned the job which is likely to be completed in next four months. The survey work will give estimate of cost of construction of proposed brige.

The new bridge has been planned to resolve the traffic problem on both ends of existing Golden bridge which is more than century old, and Sardar bridge which connects Mumbai and Surat to Vadodara and Ahmedabad.