Live: Commencement of Mumbai - Ahmedabad High Speed Rail Project, in Ahmedabad (video)
Ahmedabad: India’s first bullet train between Ahmedabad and Mumbai will run at a maximum speed of 350 km per hour, covering the 508-km stretch in under three hours.
The ambitious project, which was today launched by Prime Minister Narendra Modi and his Japanese counterpart Shinzo Abe, would cost around Rs 1.10 lakh crore. Japan is giving a loan of Rs 88,000 crore for the project at a minimal interest of 0.1 per cent.
The government wants to start the services of the proposed Ahmedabad-Mumbai High Speed Rail Network, commonly known as the bullet train on August 15, 2022 to mark India’s 75th year of Independence.
The bullet train would run at an average speed of 320 km per hour and at a maximum speed of 350 km per hour.
It will stop at 12 railway stations on the route but only for 165 seconds each. A 21-km-long tunnel will be dug between Boisar and BKC in Mumbai, of which seven km will be under water.
The railways will only require around 825 hectares of land for the project as 92 per cent of the route will be elevated, six per cent would go through tunnels and only the remaining two per cent would be on the ground.
The railways would run about around 35 bullet trains when it starts operation with about 70 trips per day. The number of trains would be increased to 105 in 2050.
Rail Minister Piyush Goyal, who was present at the event today, said it was an experience in a train that led to changes in Mahatama Gandhi’s life and now it was a train that bound India and Japan in friendship and goodwill.
Goyal had earlier said that the fare of the high-speed bullet train would be “affordable for all”.
Initially, the train would have 10 coaches with a total seating capacity of 750 passengers. Later, it is proposed to have 16 coaches with a seating capacity of 1,250 passengers.
The train would have two categories of seats–executive and economy–with the prices comparable with the base AC 2- tier fare of the Rajdhani Express.
In the initial days, around 1.6 crore people are expected to travel by the train annually, adding that by 2050, around 1.6 lakh commuters would be travelling by the high-speed train on a daily basis.
The train would require a cleaning time of four hours, after running for 20 hours.
The day's top stories in your inbox at 7 am, your time. Free.
Related stories
Traffic Diversions Announced in Vadodara for Drainage and Bullet Train Works
Bullet Train Project: Overhead Wires on Surat–Bilimora Section to Be Energised from November 20

Mumbai-Ahmedabad Bullet Train Project: First of 14 Traction Power Substations Takes Shape in Bilimora

Gujarat Deputy CM Harsh Sanghavi on Japan Visit
Latest stories
Family Inside Car Parked in Expressway’s Overtaking Lane, Highway Staff Step In (video)
Will celebrate next Holi and Diwali with Locals in Bhagal Village: Alpesh Thakor (video)
Gujarat CM launches Rs. 753 crore development works in Navsari

FIR Registered Against YouTuber Bhuvan Bam Over Obscene Content at Parul University Show in Vadodara

35,000 Sq-Meter land cleared in Prabhas Patan in 11 Months for Somnath Corridor (video)
Bhagwan Swaminarayan’s Relics Stolen from Naranpura Museum in Ahmedabad

Parul University’s Patronage of ‘Lavari’ Show Faces Flak Over Controversial Content (video)
Gujarat FDCA Raids Illegal Medical Device Manufacturing Unit

Amit Shah Standing at RSS Anthem Song Reciting

Modi Waves Candle in Tune of Song Performance in Memory of Bhupen Hazarika

Jaishankar witnessing Piprahwa Relics associated with Bhagwan Buddha

Raksha Mantri at NDA Khadakwasla Pune

President Murmu at Wedding Reception of UP Minister Sandeep Singh

Modi - Modi Chants as PM Enters Wedding Reception

Modi at wedding 'Jai Shri Ram' chants

Why Lok Sabha and Assembly seats to Increase but not Rajya Sabha?

Modi at Wedding Reception of UP Minister Sandeep Singh

99.9% Cheered for Pakistan: Bangladesh Speaker on India-Pak Football Final

Putin Selfie With Indian ‘AI Kid’ Raul Jon Aju

