Platform number 1 of Ahmedabad Railway station to stop operation of trains for 50 days from January 2

Platform number 1 of Ahmedabad Railway station to stop operation of trains for 50 days from January 2

Ahmedabad: Operation of trains from platform number 1 of Ahmedabad railway station would be stopped for 50 days from January 2 which would also result in cancellation of two pair of trains during the period while over a dozen others would be short terminated due to it.

Spokesperson of the Ahmedabad division of Western Railway, Pradip Sharma today informed this.

He said that the platform 1 will be blocked for construction of CC apron and surface improvement work for 50 days from January 2.

‘This will cause shifting of the operation of several trains to other platforms as well as cancellation of two pair of trains namely 69131/69132 Ahmedabad-Gandhinagar-Ahmedabad Memu and 69191/69192 Anand-Gandhinagar-Anand Memu train,’ he informed.

‘69113 Vadodara-Ahmedabad Memu,69106 Ahmedabad-Anand Memu, 69101 Vadodara-Ahmedabad Memu, 69128 Ahmedabad-Anand Memu, 69115 Vadodara- Ahmedabad Memu, 69102 Ahmedabad-Vadodara Memu would be short terminated at Vatva and operated from there only. 79431/79432 Ahmedabad-Mahesana-Ahmedabad Demu, 79433/79434 Ahmedabad-Patan-Ahmedabad Demu, 79435/79436 Ahmedabad-Patan-Ahmedabad Demu and 59474 Patan-Ahmedabad passenger would be short terminated at Sabarmati and operated from there during the blockade period,’ he said.

DeshGujarat