Bullet train trials likely to be conducted at 350 kmph in Gujarat in 2026
April 14, 2022
New Delhi: News agency PTI reports that the trials of the bullet train will be conducted at a speed of 350 kilometres per hour, comparable to the take-off speed of airplanes. The operational speed of the trains will be 320 kmph. The first such trial will be held between Bilimora and Surat in Gujarat in 2026, followed by other sections. The bullet trains will have less check-in time, more leg space and most of all, connectivity, which is denied on-board airplanes.The trains will run on special tracks called the “slab track system”, popularly known as HSR technology for construction of tracks, patented by the Japanese. Trains running at a speed of 350 kmph will be fit to run on these tracks, the officials said. The services will come at a fare at par with economy-class flight and is likely to have a higher free-luggage limit. The National High Speed Rail Corporation Limited (NHSRCL) has built 200-250 pillars per month between Bilimora and Surat. The longest (1.26 km) bridge under the project, being built bearing turbulent winds and tidal waves over the Narmada river, will be completed by July 2024. The work on all eight high-speed rail stations from Vapi to Sabarmati is in various stages of construction. The passenger terminal hub at the Sabarmati integrating HSR, Metro, BRT and two Indian Railways stations are expected to be completed by August this year.
Recent Stories
- Diwali Food Safety Drive: AMC Seals Two Units, Fines Four Outlets ₹40,000
- HDFC Bank Gets Govt Nod to Offer Deposits Under Capital Gains Accounts Scheme
- GSSSB Announces Recruitment for 1,237 Class-3 Posts; Applications Open on November 5
- AMC to Hike Parking Fees; Proposed New Rates Here
- Mumbai Mayor Ritu Tawde Meets Gujarat CM Bhupendra Patel
- Holiday Inn Resort to Come Up in Sasan Gir
