Gujarat CM to open a new underpass at Vaishnodevi circle on SP Ring Road
December 13, 2022
Gandhinagar: Gujarat Chief Minister Bhupendra Patel will inaugurate an underpass at Vaishnav Devi circle on Sarkhej – Gandhinagar highway on December 14. The underpass has been constructed at a cost of Rs. 40.36 crores. It is a multilayer underpass. Those traveling on Sardar Patel ring road will be able to use this underpass. The underpass is 720 meters long and 23 meters wide. It is a six-lane underpass with an 11×2 meter carriage way. Its RCC wall is 536 meters long while the RCC box is 70 meters long. The underpass is constructed by the Ahmedabad Urban Development Authority (AUDA). DeshGujarat
Recent Stories
- Surendranagar Police Raid Gym, Recover 100s of Photos and Videos of Hindu Women
- Sabarmati Riverfront Phase-II: 82% Work Completed, Entire Phase Expected by December 2027
- Gujarat Govt Buildings Have 95 MW Rooftop Solar Capacity, Another 65 MW Planned This Year
- Surat Airport Expands Use of Renewable Energy
- Bullet Train Bridge over Sabarmati River in Ahmedabad completed
- Kheda Railway Station Gold Robbery Solved Within Hours; ₹4 Crore Gold Recovered, Four Arrested
