Entry and exit points of new Vadodara – Bharuch expressway explained
February 23, 2024
Vadodara: Journey between Vadodara and Bharuch is speedier, safer and smoother now. The Prime Minister Narendrabhai Modi inaugurated this stretch of Delhi – Mumbai greenfield national expressway virtually from Navsari on Thursday.
The newly opened highway is 85 km long. The permitted highest speed on this highway is 120 km/hour, however practically the average speed achieved is 90 km/hour. It takes 40 minutes time to reach Bharuch from Vadodara. If a vehicle exceeds the sped beyond 120 km/h, the camera would deduct fine from Fastag balance. The highway starts at Vasad and takes upto Dahegam where exit for Bharuch is located.
At present, the highway is free to access, but within a month or so, toll tax will be effective here.
Entry to the new highway is possible from the 1. Vadodara – Ahmedabad expressway, from Vasad and from Samiyala. Same are the exit points.
Inauguration of the Vadodara-Bharuch section of the Delhi-Mumbai Expressway today marks a milestone in infrastructure development for Gujarat. This crucial stretch not only enhances connectivity between major economic hubs but also promises a smoother journey for several people. pic.twitter.com/KlmYDABB7d
— Narendra Modi (@narendramodi) February 22, 2024
Access points:
From Ahmedabad – Travel on National Expressway 01 connecting Ahmedabad to Vadodara and cross Mahi river bride. After that, before Vadodara, you will get an approach to expressway to Bharuch.
From Vadodara – Reach Bhayli and then there’s Samiyala and from there you can enter the Expressway to Bharuch.
From Nandesarior Vasad or the other Ahmedabad-Vadodara highway – Reach Fajalpur, Rayka, Ravines Eco Park area located next to Mahi river from where you can enter the Expressway to Bharuch.
From Bharuch – Reach Dahegam – Manubar area and take Expressway to Vadodara.
DeshGujarat
🗃️ This story is from our archives and may contain outdated information.
Recent Stories
- JioStar Takes TATA IPL 2026 Reach to All-Time High of Over 1.2 Billion
- AMC Installs Ahmedabad’s First Pelican Signal on Trial at CG Road
- Indian Railways Clears ₹140 Crore Kavach Project for 598 km in Ahmedabad Division
- Gujarat HC Gives Yusuf Pathan Four Weeks, Warns of Higher Damages in Vadodara Plot Case
- Viksit Gujarat Industrial Policy 2026 Unveiled; Aims to Make State Global Manufacturing Hub
- Jio Platforms Surges into Global Top 20 in latest WIPO Patents Ranking
