PM Modi visits Surat; reviews progress of Ahmedabad–Mumbai bullet train project
Surat: Prime Minister Narendra Modi today arrived at Surat International Airport for a day-long visit to his home state of Gujarat. From the airport, he left via helicopter to visit the under-construction Bullet Train Station in the Antroli area. At the site, the Prime Minister reviewed the progress of the station and the entire Mumbai–Ahmedabad High-Speed Rail Corridor (MAHSR) project.
The Bullet Train will run along a 508-kilometre route, covering 352 km in Gujarat and Dadra & Nagar Haveli, and 156 km in Maharashtra. The corridor will connect major cities, including Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi, Boisar, Virar, Thane, and Mumbai, marking a transformative step in India’s transportation infrastructure.
The project, being carried out by the National High-Speed Rail Corporation Ltd. (NHSRCL), has over 85% (465 km) of its route on viaducts, of which 326 km of viaduct work has been completed. Furthermore, 17 out of 25 river bridges have already been constructed.
The Surat–Bilimora section, covering around 47 km, is in an advanced stage of completion, with civil works and track-bed laying fully completed.
PM Modi inspected the Surat Bullet Train station, whose design draws inspiration from the city’s world-renowned diamond industry, reflecting both elegance and functionality. The structural work of the building is already completed, while finishing activities such as interiors, roofing, and station facilities are currently in progress. Track works, including construction of the RC track bed and installation of temporary tracks at the station, have also been completed.
According to NHSRCL, the total height of the station is 26.3 meters, with a total built-up area of 58,352 sq. m. The station building comprises three levels:
-
Ground Level: Facilities such as parking, pick & drop bays (for cars, buses, and autos), security checks, lifts, and escalators for commuters.
-
Concourse Level: Waiting lounges, restrooms, kiosks, and ticketing counters.
-
Platform Level: Boarding platforms for passengers.
Upon completion, the Bullet Train will reduce travel time between Mumbai and Ahmedabad to nearly two hours, revolutionizing inter-city travel by making it faster, easier, and more comfortable. DeshGujarat
The day's top stories in your inbox at 7 am, your time. Free.
Related stories
Insiders sum up Prime Minister Narendra Modi’s recent Gandhinagar visit in 5 points
PM Modi on Gujarat Visit; to hold Dinner Meeting with State Ministers, BJP Leaders

PM Modi’s Ambaji Temple Visit on Nov 14 Cancelled

PM Modi to Visit Ambaji Mandir in Gujarat on Nov 14
Latest stories
Family Inside Car Parked in Expressway’s Overtaking Lane, Highway Staff Step In (video)
Will celebrate next Holi and Diwali with Locals in Bhagal Village: Alpesh Thakor (video)
Gujarat CM launches Rs. 753 crore development works in Navsari

FIR Registered Against YouTuber Bhuvan Bam Over Obscene Content at Parul University Show in Vadodara

35,000 Sq-Meter land cleared in Prabhas Patan in 11 Months for Somnath Corridor (video)
Bhagwan Swaminarayan’s Relics Stolen from Naranpura Museum in Ahmedabad

Parul University’s Patronage of ‘Lavari’ Show Faces Flak Over Controversial Content (video)
Gujarat FDCA Raids Illegal Medical Device Manufacturing Unit

Amit Shah Standing at RSS Anthem Song Reciting

Modi Waves Candle in Tune of Song Performance in Memory of Bhupen Hazarika

Jaishankar witnessing Piprahwa Relics associated with Bhagwan Buddha

Raksha Mantri at NDA Khadakwasla Pune

President Murmu at Wedding Reception of UP Minister Sandeep Singh

Modi - Modi Chants as PM Enters Wedding Reception

Modi at wedding 'Jai Shri Ram' chants

Why Lok Sabha and Assembly seats to Increase but not Rajya Sabha?

Modi at Wedding Reception of UP Minister Sandeep Singh

99.9% Cheered for Pakistan: Bangladesh Speaker on India-Pak Football Final

Putin Selfie With Indian ‘AI Kid’ Raul Jon Aju
