Ahmedabad Metro Phase-2 Expansion: GMRC Invites Bids for Geotechnical Investigation
December 08, 2025
Gandhinagar: The Gujarat Metro Rail Corporation (GMRC) Limited has invited e-tenders for carrying out geotechnical investigation works for two key sections of the Ahmedabad Metro Rail Project – Phase 2, according to the latest Notice Inviting Tender (NIT).
The tender seeks qualified and experienced agencies for investigation work on:
Phase-2A: Airport Line
6.032 km (elevated viaduct and underground stretch) with five stations
Phase-2B: GIFT City Extension Line
3.33 km elevated viaduct with three stations
The estimated cost of the work is ₹2.14 crore, with a completion deadline of four months from the award of contract.
The tender forms part of GMRC’s ongoing efforts to accelerate work on the critical Phase-2 expansion, which will enhance metro connectivity between Motera, the international airport, Gandhinagar, and GIFT City.
#Ahmedabad Airport #Ahmedabad Metro #Ahmedabad-Gandhinagar metro #GIFT #Gift city #GMRC #SVPI airport
Leave a Reply
Related Stories
GIFT City to have Two More Metro Stations; GSRTC Terminal also on Cards
Ahmedabad Metro Phase 2 Extension to Airport and GIFT City: GMRC Floats Tender for Design Consultancy
Recent Stories
- Ambaji Shaktipeeth Corridor Project: Phase-2 Anti-Encroachment Drive Begins
- Stray Dog Menace: 7-Year-Old Boy Attacked in Surat
- Rajkot Businessman Loses Rs 29 Lakh in Fake SNITCH Franchise Scam
- Schools Reopen Across Gujarat After 35-Day Summer Vacation; New Academic Year 2026-27 Begins
- Vadodara Police Bust Fake Call Centre Targeting Foreign Nationals, Four Held
- Above-Normal Temperatures Persist Across Gujarat; Ahmedabad, Rajkot Hottest at 41.9°C
