Resurvey for Radha Nesda Ultra Mega Solar Power Plant in Gujarat
March 17, 2016
Palanpur
Gujarat government has allotted 1407 hectare land to Gujarat Power Corporation to set up a 750 MW ultra mega solar plant in Vav taluka of Banaskantha district. A request has been sent for setting up Ultra Mega Solar Power Project. However local villagers have pointed out that about 68 hectare land is grass land and therefore re-survey should be done for adjustment of this 68 hectare land. The government has in response to this complain started re-survey procedure.
According to Karsanbhai Rajput, Sarpanch of Radha Nesda group panchayat which is located 30 km away from international border with Pakistan, the government will return 68 hectare land. He said the plant will transform this area. Unemployed youths will get employment and border area will have a new look.
The land has been allocated 6 km away from Radha Nesds in Rann of Kutch where Chor Zad, Limda Bet, old Bhagwati mandir and other bet areas are located.
– DeshGujarat
Recent Stories
- Four Cheetahs from Kenya to Arrive in Gujarat by Year-End
- AMC to Hold Terrarium Workshop Ahead of Ahmedabad Flower Show 2027
- AMC Sets Deadline for Repairs at Community Halls Amid Wedding Season
- Stray Cattle Menace: AMC to Review Performance of 19 Cattle-Catching Teams
- AMC Standing Committee Returns Maktampura Gymnasium Operation Tender
- HYROX Gujarat Kicks Off, Draws 6000 Athletes from India and Abroad
- Traffic Diversions Announced in Vadodara for Drainage and Bullet Train Works
- SMC Worker Attacked by Stray Dog, Suffers 7+ Bite Injuries
- Rajkot Biker Dies After Kite String Slits His Throat
- 140 Kg Ganja Seized from Surat Flat, Migrant Held
- Capsule Traffic System Implemented at Pakwan Crossroads on SG Highway
