28-km Vadodara Ring Road Phase 1 Set to Open Within a Month: VMC Commissioner

28-km Vadodara Ring Road Phase 1 Set to Open Within a Month: VMC Commissioner

Vadodara: Phase 1 of the 75-metre-wide Vadodara Ring Road, spanning 28 km, is expected to open to the public within a month, with most of the construction work completed, Municipal Commissioner Arun Mahesh Babu said following a review meeting.

The Ring Road, developed by the Vadodara Municipal Corporation (VMC) and Vadodara Urban Development Authority (VUDA), will allow motorists travelling between Ahmedabad and Surat to bypass the city, reducing traffic congestion on major roads and saving travel time.

The project is expected to provide a direct route for through-traffic, particularly heavy vehicles, without entering Vadodara city.

During the review meeting, officials also discussed the city’s water supply situation. The administration said water from the Narmada River is being channelled through Sardar Sarovar Narmada Nigam Limited (SSNL) to maintain water levels in Ajwa Lake.

The civic administration has also made arrangements to secure additional Narmada water if required during the summer months to ensure an adequate supply to residents.  DeshGujarat