Gujarat CM inaugurates Vestas wind power blade plant at Bavla (video)
Gujarat Chief Minister Vijay Rupani today inaugurated a wind power blade manufacturing plant of wind turbine manufacturer Vestas at Bavla in Ahmedabad.
Vestas, a Denmark-based firm is the world’s largest wind turbine maker. Vestas stepped in India in 1989, it was among the earlier entrants here. However, it practically quit India in 2012, after having sold machines worth 3 GW.
It technically re-entered India in 2014. In 2015-16, not a single Vestas machine was installed in the country.
But then the company was back with a bang. It bagged orders from two wind energy companies and installed 46 MW for one of them and 10 MW out of the other’s order for 40 MW.
The company has put up a blade plant in Gujarat, investing 50 million euros ($54 million), which will bring out India’s first locally-made carbon-fibre blades.


These blades are stronger and lighter than the conventional glass-fibre blades by about 25 per cent. This –works out to about 2.5 tonnes a blade, or 7.5 tonnes lesser weight on top of the tower.
The machines that Vestas is selling today – the 2 MW, V 110 – are also carbon-fibre, but they are imported.
Making the blades locally will be cheaper and also save transportation costs, allowing Vestas to drop prices.
Speaking on this occasion, Gujarat Chief Minister thanked the company for taking youths from Gujarat to Denmark and America for three months in order to train them to work in new plant at Bavla. He said this is actual realization of ‘Make in Gujarat’. Rupani pointed out that rate of wind power has come down from about Rs 15 to Rs 3.60 per unit. Rupani said Gujarat generates 4700 MW through wind energy. The state targets to generate another 1000 MW power through wind power in next one year. The Chief Minister further said that the states that don’t have enough wind flow to generate wind power will be supplied power from Gujarat. He said, as per MoU signed, the company has set up this plant in just one year. Gujarat plant of Vestas will manufacture wind power generation blades for 500 MW per year. Today further MoUs are signed today for even more production in Gujarat.
Memorandum of Understanding(MoU) for 1,000 MW wind power generation was signed between Gujarat govt arm Gujarat Energy Development Agency(GEDA) and Vestas.
DeshGujarat
The day's top stories in your inbox at 7 am, your time. Free.
Latest stories
Family Inside Car Parked in Expressway’s Overtaking Lane, Highway Staff Step In (video)
Will celebrate next Holi and Diwali with Locals in Bhagal Village: Alpesh Thakor (video)
Gujarat CM launches Rs. 753 crore development works in Navsari

FIR Registered Against YouTuber Bhuvan Bam Over Obscene Content at Parul University Show in Vadodara

35,000 Sq-Meter land cleared in Prabhas Patan in 11 Months for Somnath Corridor (video)
Bhagwan Swaminarayan’s Relics Stolen from Naranpura Museum in Ahmedabad

Parul University’s Patronage of ‘Lavari’ Show Faces Flak Over Controversial Content (video)
Gujarat FDCA Raids Illegal Medical Device Manufacturing Unit

Amit Shah Standing at RSS Anthem Song Reciting

Modi Waves Candle in Tune of Song Performance in Memory of Bhupen Hazarika

Jaishankar witnessing Piprahwa Relics associated with Bhagwan Buddha

Raksha Mantri at NDA Khadakwasla Pune

President Murmu at Wedding Reception of UP Minister Sandeep Singh

Modi - Modi Chants as PM Enters Wedding Reception

Modi at wedding 'Jai Shri Ram' chants

Why Lok Sabha and Assembly seats to Increase but not Rajya Sabha?

Modi at Wedding Reception of UP Minister Sandeep Singh

99.9% Cheered for Pakistan: Bangladesh Speaker on India-Pak Football Final

Putin Selfie With Indian ‘AI Kid’ Raul Jon Aju


