Vadodara Ring Road construction likely to start in August this year
June 23, 2017
Vadodara: Construction work for ring road around Vadodara city is likely to kick off in upcoming month of August. The project will be taken up jointly by Vadoara Municipal Corporation(VMC), Vadodara Urban Development Authority(VUDA) and Road and Building department of Government of Gujarat at a cost of Rs 120 crore.
A 38 km long ring road will have 11 km portion in VMC limit between Sama – Chhani – Gorva stretch while 16 km area Gorva – Ankodia – Khanpur – Bhayli – Jambusar narrow gauge will be in VUDA area. Another 19 km stretch is located in the State government limits.
In VMC limit, there shall be one railway over bridge and one flyover bridge. Tenders are likely to be floated on 1st July.
The ring road will have 10 meter carriage way on both sides and 2.5 meter divider in the center with plantation through drip irrigation.
Heavy vehicles from National Highway number 8 or those from Padra – Jambusar side will no more enter d
Related Stories
Recent Stories
- 28-km Vadodara Ring Road Phase 1 Set to Open Within a Month: VMC Commissioner
- Tata Sons Chairman Chandrasekaran visits Dholera to review semiconductor fab progress
- L&T to Develop 300 MW Battery Energy Storage Project at Khavda in Gujarat
- Tata AutoComp Inaugurates 3 Plants in Sanand; Targets 1,500-Vehicle Daily Capacity
- GujRERA Web Portal to Show Developers Track Records for Property Buyers
- How redRail Helps Passengers Find and Compare Trains Between Stations
- Poaching at Nalsarovar: 29 Birds Recovered, Four Dead
- Two Booked for Allegedly Duping Gujarat Cops by Promising Favourable Postings
- India’s First Barrier-Less Choryasi Toll Plaza sees 3.69 lakh toll violations in 3 months
- Torrent Power Hikes Fuel Surcharge in Ahmedabad, Surat; Electricity Bills to Rise
- Visitors Enter Hippo Enclosure at Kamatibaug Zoo in a Security Lapse in Vadodara
