Ahmedabad Metro train operational time extended for Navratri period
October 17, 2023
Sabarmati: Gujarat Metro Rail Corporation Ltd. (GMRC) has extended its operational hours during the period of the ongoing Navratri festival. GMRC in a note stated:-
‘Presently, Metro Train services are operational in Ahmedabad between 06.20 AM to 10 PM
at a frequency of 20 minutes from 6.20 AM to 7 AM and at 12 minutes frequency from 7 AM to 10 PM.’
‘On Account of the celebration of the Navratri festival, on the following dates, the metro train shall be
available as per the timings tabulated below.’
Date: 17 to 23 October
Metro timings: From morning 6.20 hours (6.20 am) to 2.00 hours post midnight (2.00 am)
‘On the above dates, metro train services will be available as per schedule till 10 PM and will be available at an interval of 20 minutes in extended hours between 10 PM to 2 AM (midnight) from each metro station.’
‘The last train departure time will be 2 AM midnight from each terminal station in each corridor.’ DeshGujarat
Recent Stories
- Shah in Anand hails Salt Cooperative Initiative of Kutch, predicts Rs. 1 lakh crore Turnover of Amul next year
- Section 144 imposed after arrest of AAP MLA Chaitar Vasava
- 24 hours rainfall data from across Gujarat; Bhiloda tops, Surat City had over 4.56 inch rain
- Chaturmas 2025 starts today across Gujarat; will end on 2nd November
- Gauri Vrat Goro begins across Gujarat ; Jaya Parvati Vrat from July 8
- Stray bull attacks man in Bhachau, Kutch; CCTV footage surfaces
- In pictures: Upcoming Five-Star Hyatt Hotel at GIFT City, Gujarat