Sabarmati over bridge to remain shut for repair during 4-6 November
November 04, 2023
Sabarmati: Sabarmati overbridge near the power station will be shut for traffic after the England-Australia World cricket match, till November 6 for repair and road surfacing. The road was to shut from 3rd November, however, due to the cricket match nearby at Motera stadium, the bridge will now be shut for repair after the match is over.
The bridge connects Sabarmati to the RTO circle. It will be shut from the night of 4 November to 9 am on 6t November. The repair works include resurfacing using the milling method and patchwork. Commuters are asked to use alternative routes in the absence of this stretch. The repair works will be executed by the Amdavad Municipal Corporation(AMC). The bridge is located over the Ahmedabad-Delhi main railway line, close to Sabarmati railway station and Torrent power station. DeshGujarat
Recent Stories
- Diwali Food Safety Drive: AMC Seals Two Units, Fines Four Outlets ₹40,000
- HDFC Bank Gets Govt Nod to Offer Deposits Under Capital Gains Accounts Scheme
- GSSSB Announces Recruitment for 1,237 Class-3 Posts; Applications Open on November 5
- AMC to Hike Parking Fees; Proposed New Rates Here
- Mumbai Mayor Ritu Tawde Meets Gujarat CM Bhupendra Patel
- Holiday Inn Resort to Come Up in Sasan Gir
