Railways plan 40-km Dahej – Bhavnagar rail-sea link connecting Saurashtra to South Gujarat
March 13, 2025
Bhavnagar: The Ministry of Railways has sanctioned ₹52.16 crore for conducting Final Location Surveys (FLS) and preparing Detailed Project Reports (DPRs) for ten major railway projects in Gujarat and Madhya Pradesh. This includes a major 40-km-long railway sea-link project between Dahej and Bhavnagar.
This railway sea-link project will be the first of its kind in the state of Gujarat. The railway line, which will be built along the sea route between Dahej and Bhavnagar, will directly connect Saurashtra to South Gujarat, ultimately leading to Mumbai. Currently, travelers heading toward Mumbai must take the Ahmedabad-Anand-Vadodara route, but once the project is completed, this detour will no longer be necessary.
For this project, the Railway Board has allocated ₹1 crore for the Final Location Survey (FLS). According to railway officials, this survey will help determine the project’s starting point.
At present, it takes nine hours to cover the 530-km distance from Bhavnagar to Surat, but with this project, the distance will be reduced to 160 km, and the journey will take just three hours. Similarly, the travel time from Saurashtra to Mumbai, which currently takes 13 hours, will be cut down to eight hours.
Additionally, people traveling between Saurashtra and South Gujarat by train will no longer need to pass through Ahmedabad or Vadodara. Instead, they will reach Bharuch directly via the sea-link railway from Bhavnagar through Dahej.
Meanwhile, preparations are also underway for a 924-km-long coastal railway line connecting Dahej to Porbandar, Dwarka, and Okha.
In addition to the 40-km railway sea-link project, the Railway Ministry has sanctioned ₹23 crore to Zonal Railways for surveying the final location of a 924-km coastal railway line. These proposed coastal railway lines include:
- Dahej-Jambusar-Kathana-Khambhat-Dholera-Bhavnagar
- Bhavnagar-Mahuva-Pipavav
- Pipavav-Chhara-Somnath-Sardiya-Porbandar-Dwarka-Okha
Recent Stories
- PIB Fact Check Unit debunks fake video claiming attack on Hazira port in Surat, Gujarat
- Blackout at Mundra and Kandla ports; shipping movement stopped until daylight
- Security measures raised to MARSEC Level 2 at all Indian ports, terminals, and ships
- Passenger advised to reach airport 3 hrs prior to departure as BCAS directs enhanced airport security
- Gujarat's 7 airports in latest NOTAM declared by Govt of India ; to remain shut on May 9
- Blackout enforced across the entire Kutch district; 3 Pakistani UAVs shot down
- Mumbai Indians vs Punjab Kings relocated to Narendra Modi Stadium, Ahmedabad