Gujarat govt to set up 250 MW solar plant, Vadodara to get 45 MW (video)

VMC Office, Vadodara Municipal Corporation
Vadodara: The Gujarat government is setting up a centrally located 250 MW solar power plant to supply electricity to eight municipal corporations, including Vadodara. Under this project, the Vadodara Municipal Corporation (VMC) will receive 45 MW of solar power.
Chairman of the Standing Committee, Dr. Sheetal Mistry, in a media briefing, said, “The Gujarat government is building a centrally located 250 MW solar power plant, which will distribute power to eight municipal corporations. As part of this project, the Vadodara Municipal Corporation will receive 45 MW of solar power. The investment for this 45 MW solar plant will be around ₹261 crore. Out of this, ₹131.5 crore will be borne by the government, while ₹131.5 crore will be borne by Vadodara city. An investment of ₹43.1 crore will be made, and ₹87 crore will be raised through a loan spanning 3-4 years, with an annual interest payment of ₹45 lakh. The savings from the 45 MW solar power plant, after adjusting for electricity costs, will be around ₹42 crore per year. The proposal for this project was laid by the Gujarat government, and with this initiative, we are moving forward towards achieving net-zero emissions by 2070.”
In this projct, Ahemdabad will have 80 MW partnership while Surat 40, Vadodara and Rajkot 45 each, Gandhinagar, Jamnagar, Junagadh and Bhavnagar will have 10 MW partnership each. The project will be led by Gujarat government arm Gujarat Urban Development Corporation Ltd (GUDCL). The life of the project shall be 25 years. VMC will need to pay installments and interest and Rs. 45 lakh per year for operational and management, but will save on Rs. 42 crore power bill every year. The 250 MW solar plant will in totall save Rs. 234 crores on power bills.
DeshGujarat
The day's top stories in your inbox at 7 am, your time. Free.
Related stories
Traffic Diversions Announced in Vadodara for Drainage and Bullet Train Works
VMC to Raise Rs 200 Crore Through India’s First Certified Blue Resilience Bond

Vadodara Civic Body Plans to Reintroduce Double-Decker Buses in City

28-km Vadodara Ring Road Phase 1 Set to Open Within a Month: VMC Commissioner
Latest stories
FIR Registered Against YouTuber Bhuvan Bam Over Obscene Content at Parul University Show in Vadodara

35,000 Sq-Meter land cleared in Prabhas Patan in 11 Months for Somnath Corridor (video)
Bhagwan Swaminarayan’s Relics Stolen from Naranpura Museum in Ahmedabad

Parul University’s Patronage of ‘Lavari’ Show Faces Flak Over Controversial Content (video)
Gujarat FDCA Raids Illegal Medical Device Manufacturing Unit
Surat Aquarium Set for Revamp Under PPP Model

Illegal Shop of NDPS Accused Kalu Pathan Demolished in Karjan
JeM Terror Suspect Sent Photos, Videos of Vadodara Air Force Station to Pakistan

President Murmu at Wedding Reception of UP Minister Sandeep Singh

Modi - Modi Chants as PM Enters Wedding Reception

Modi at wedding 'Jai Shri Ram' chants

Why Lok Sabha and Assembly seats to Increase but not Rajya Sabha?

Modi at Wedding Reception of UP Minister Sandeep Singh

99.9% Cheered for Pakistan: Bangladesh Speaker on India-Pak Football Final

Putin Selfie With Indian ‘AI Kid’ Raul Jon Aju

Jaishankar Meets Foreign Ministers of Mauritius and Seychelles

Amit Shah Meets Ranbir Kapoor, Sai Pallavi & Ramayana Team

Jaishankar meets defence journalists from over 30 countries

