Danger of flood in Vadodara averted
September 08, 2025
Vadodara: In a relief to the city of Vadodara, the possibilities of flood are averted by Vadodara Municipal Corporation (VMC) by shutting the 62 gates of Ajwa dam that were opened a day ago. The relief is also due to no significant rainfall in Vadodara and Panchmahal districts on Saturday/Sunday. Had there been heavy rains, the river Vishwamitri in Vadodara could cross danger level of 26 ft.
As per the rule, the level os 212.50 ft needs to be maintained in Ajwa dam by 30th September. As the level crossed 212.95 ft mark, 62 gates were opened and therefore Vishwamitri river cross 21.50 ft mark on Sunday. However at 1 pm, the gates were shut.
With Ajwa dam’s gates shut and no significant rain in catchment, the level of Vishwamitri started going down and was at 17.39 at 9 am on Monday, giving relief to the city. It’s worth noting that the danger mark is 26 ft and flood gets widespread across the city after 31 ft. DeshGujarat
| Water Level Statistics through Sensor | |||
|---|---|---|---|
| Location | Water Level (Feet) | Date & Time | |
| AJWA DAM |
|
08-09-2025 05:31:51 | |
| AKOTA BRIDGE |
|
08-09-2025 09:11:36 | |
| ASOJ FEEDER |
|
08-09-2025 09:10:49 | |
| BAHUCHARAJI BRIDGE |
|
08-09-2025 09:11:32 | |
| KALA GHODA |
|
08-09-2025 09:11:33 | |
| MANGAL PANDEY BRIDGE |
|
08-09-2025 09:11:32 | |
| MUJMAUDA BRIDGE |
|
08-09-2025 09:11:08 | |
| PRATAPPURA DAM |
|
08-09-2025 09:10:50 | |
| SAMA HARNI BRIDGE |
|
08-09-2025 09:11:18 | |
| VADSAR BRIDGE |
|
08-09-2025 09:11:47 | |
Recent Stories
- CII Gujarat names Achal Bakeri as Chairman, Naresh Patel as Vice Chairman for 2026–27
- VUDA Clears ₹801 Crore Budget, ₹50 Crore Allotted for Ring Road Project
- SC Orders Status Quo in Bhadra Parisar Case; Stays Reinstatement of Street Vendors
- Hindu Minor Lured Into Love Trap, Fake Aadhaar Used to Book Hotel Room; Three Held in Ahmedabad
- Delivery of 10 New Trainsets for Ahmedabad Metro Likely to Commence from June 2026
