Solar Power Park at Khavda in Rann of Kutch Submerged, Works Suspended
September 12, 2025
Bhuj: The Rann of Kutch, known for turning into a water-filled expanse during every monsoon, is once again witnessing widespread inundation that is likely to last well into the latter part of winter.
According to reports, the solar power park currently under development in the Rann has also been submerged under water. Photographs and videos circulating from the site show large sections of the project covered by floodwater.
વિશ્વના સૌથી મોટા અદાણી પ્લાન્ટમાં પાણી ફરી વળ્યું.
પ્લાન્ટનો અહેવાલ રિપ્લયમાં pic.twitter.com/QFxcNPGHKD— Dilip Patel દિલીપ પટેલ (@dmpatel1961) September 10, 2025
Khavda Solar Project involves solar projects by Adani Green Energy, Sarjan Realities, NTPC , Gujarat Industrial Power Company and Gujarat State Electricity Corporation.
Officials said that due to the situation, all ongoing construction and installation work at the solar park has been suspended until conditions improve. The project, which is considered a crucial step toward boosting Gujarat’s renewable energy capacity, is now facing delays as a result of the seasonal flooding.
The Rann of Kutch, a salt desert, traditionally remains waterlogged for months after heavy rains. Experts have previously cautioned that such recurring seasonal conditions pose challenges for infrastructure projects in the region. DeshGujarat
Recent Stories
- Diwali Food Safety Drive: AMC Seals Two Units, Fines Four Outlets ₹40,000
- HDFC Bank Gets Govt Nod to Offer Deposits Under Capital Gains Accounts Scheme
- GSSSB Announces Recruitment for 1,237 Class-3 Posts; Applications Open on November 5
- AMC to Hike Parking Fees; Proposed New Rates Here
- Mumbai Mayor Ritu Tawde Meets Gujarat CM Bhupendra Patel
- Holiday Inn Resort to Come Up in Sasan Gir
