Sabarmati Railway Station to implement new entry-exit arrangements from Jan 20

Ahmedabad: With redevelopment work progressing rapidly at Sabarmati Railway Station, Western Railway has announced temporary changes to passenger entry and exit arrangements on the Dharmnagar side to ensure smooth movement and improved traffic management.

The revised system will remain in effect from January 20, 2026, to April 15, 2026.

Revised Passenger Movement Plan

Entry:
Vehicles will enter from near the MMTS Building, adjacent to the Bullet Train Station (Green Line). Passengers can access the railway platforms through the second floor of the newly constructed building.

Exit:
Passengers will exit via the foot overbridge on the Mahesana side (Purple Line). A dedicated pick-up zone has been created at this location for added convenience.

Parking:
Parking facilities have been arranged at two designated locations near the exit gate.

Facilities Available in the New Station Building

  • Ground Floor: Unreserved Ticket System (UTS)

  • First Floor: Passenger Reservation System (PRS)

  • Second Floor: Waiting Room and Lounge Area

Railway authorities have urged passengers to carefully follow updated signage and instructions issued by on-ground staff to ensure a smooth and hassle-free travel experience during the redevelopment period. DeshGujarat

Image