Vadodara Commissioner Pulls Up Officials Over Melting Roads, Orders Probe
March 13, 2026
Vadodara: Vadodara Municipal Commissioner Arun Mahesh Babu on Friday expressed strong displeasure over incidents of asphalt melting at multiple locations in the city and directed officials to take strict action against contractors responsible for the works.
During a review meeting held to assess ongoing civic projects, the Commissioner sought a detailed account of works related to water supply, drainage and road construction. He instructed officials to ensure that all projects are completed within the stipulated timeline, especially with elections approaching and the monsoon season expected after summer.
The meeting turned tense when the issue of asphalt melting on newly constructed roads was raised. Reports indicated that asphalt had melted at nearly 10 locations across the city.
Particularly, the Commissioner questioned officials about three locations where the problem was reported — behind Makarpura depot, the stretch from Express Hotel to Enjoy Restaurant in Alkapuri, and near Sangam crossroads.
When the Executive Engineer attempted to justify the issue by stating that such incidents also occur in cities like Surat, Navsari and Ahmedabad due to technical factors, the Commissioner rejected the explanation.
He questioned the officials sharply, asking why roads do not melt in states like Rajasthan or outside Gujarat if the issue is merely technical.
Taking a stern stance, Mahesh Babu ordered that no contractor should be given the benefit of doubt and directed officials to issue notices to the contractors responsible for the three roads. He also instructed that penalties be imposed on the contractors if irregularities are found.
As an immediate safety measure, the Commissioner ordered officials to sprinkle sand at spots where the asphalt has melted. He further directed that samples of asphalt from the affected roads be collected and sent to a laboratory for examination to determine the quality of materials used.
The civic body has been holding regular review meetings to push for faster completion of infrastructure works ahead of the monsoon season. The Commissioner reiterated that any negligence or substandard work by contractors will not be tolerated.
Recent Stories
- Rohit Sharma to Captain Mumbai Indians
- Surat Heritage Walk to begin Nov 29, Cover 12 Historic Sites every Sunday
- Sabarmati Riverfront to Host Ironman 70.3 Triathlon in Ahmedabad
- Western Railway to Add Extra Coaches to Rajdhani, Shatabdi, 5 Other Trains
- Western Railway to Run 2 Special Trains from Ahmedabad to South India
- Ahmedabad-Mumbai Karnavati Express Terminal to Be Temporarily Shifted
- Gujarat Tops India in Compostable Plastics Manufacturing with 62 Units
- Gujarat Draft Electoral Roll 2027 Published, State Has 4.48 Crore+ Registered Voters
- Gujarat CM Holds Performance Review of 16 Govt Depts
- Delhi - Mumbai Expressway: Pungam Entry-Exit Point Takes Shape Near Ankleshwar
- Sabarmati Riverfront Roads to Remain Shut on Nov 29; Traffic Diversions Announced
