Rajkot’s Sandhiya Pul to Open for Vehicles in May
April 30, 2026
Rajkot: In a major relief for motorists and residents, the long-awaited Sandhiya Pul is expected to be opened to the public within the next 10 days.
The bridge is expected to significantly ease traffic congestion and improve connectivity between the eastern and western parts of the city. For several years, commuters have faced delays due to diversions and bottlenecks in the area, leading to increased travel time and fuel consumption.
It is learnt that preparations for the formal inauguration are in the final stages following the appointment of new office-bearers. The opening ceremony is likely to take place within the next 10 days.
Once operational, the bridge is expected to streamline traffic movement and strengthen the city’s transport infrastructure, bringing much-needed relief to daily commuters. DeshGujarat
Recent Stories
- Pakwan Circle Capsule Traffic System on SG Highway Suspended
- Four Cheetahs from Kenya to Arrive in Gujarat by Year-End
- AMC to Hold Terrarium Workshop Ahead of Ahmedabad Flower Show 2027
- AMC Sets Deadline for Repairs at Community Halls Amid Wedding Season
- Stray Cattle Menace: AMC to Review Performance of 19 Cattle-Catching Teams
- AMC Standing Committee Returns Maktampura Gymnasium Operation Tender
- HYROX Gujarat Kicks Off, Draws 6000 Athletes from India and Abroad
- Traffic Diversions Announced in Vadodara for Drainage and Bullet Train Works
- SMC Worker Attacked by Stray Dog, Suffers 7+ Bite Injuries
- Rajkot Biker Dies After Kite String Slits His Throat
- 140 Kg Ganja Seized from Surat Flat, Migrant Held
