Western Railway conducts Speed Trial on Adaraj Moti–Vijapur Broad-Gauge Line in Ahmedabad division
December 23, 2025
Ahmedabad: As part of the Adaraj Moti–Vijapur gauge conversion project, Western Railway’s Ahmedabad division recently conducted a successful speed trial on the newly converted broad-gauge railway line. A locomotive was run at a maximum speed of 136 km per hour on the Adaraj Moti–Vijapur section, marking a key milestone in the project.
The trial was conducted between kilometer 6/4 and kilometer 45/1 using a light engine. During the test, the track was thoroughly inspected by departmental trains, measuring instruments, and a team of technical experts to ensure safety, stability, and operational readiness.
Once operational, this railway line will be directly connected to the recently gauge-converted Ambaliyasan–Vijapur line, paving the way for faster, safer, and smoother train operations. The new broad-gauge connectivity is expected to benefit Ambaliyasan and the rural areas of North Gujarat, offering passengers a time-saving, secure, and convenient travel option.
Railway officials highlighted that speed trials are a crucial technical procedure conducted to verify the quality, stability, and safety standards of newly converted tracks before regular train services commence. DeshGujarat
Recent Stories
- CII Gujarat names Achal Bakeri as Chairman, Naresh Patel as Vice Chairman for 2026–27
- VUDA Clears ₹801 Crore Budget, ₹50 Crore Allotted for Ring Road Project
- SC Orders Status Quo in Bhadra Parisar Case; Stays Reinstatement of Street Vendors
- Hindu Minor Lured Into Love Trap, Fake Aadhaar Used to Book Hotel Room; Three Held in Ahmedabad
- Delivery of 10 New Trainsets for Ahmedabad Metro Likely to Commence from June 2026
