In photos: Construction of Dwarka Sudama setu almost complete
August 21, 2015
Dwarka
Rs 8 crore ‘Sudama Setu’ bridge over the river Gomti to connect Dwarka with Panchnad Tirth is almost built.
Reliance Industries Limited (RIL), in collaboration with the Gujarat Tourism Department and Pavitra Yatradham Vikas Board, is building ‘Sudama Setu’. RIL’s Shri Parimal Nathwani is personally taking interest for speedy implementation of this project.
The construction of the cable-stayed bridge on the river Gomti, connecting Dwarkadheesh’s Jagat Mandir and Panchnad Tirth is likely to be completed before the festival of Janmashtami this year.

The hanging bridge has been named ‘Sudama setu’ in fond memories of friendship of Dwarkadheesh Shri Krishna and Porbandar’s poor Brahmin Sudama.
At present, pilgrims use boats to cross the Gomti river to reach Panchnad on the opposite bank.

Once the ‘Sudama setu’ is completed, the pilgrims will be able to visit Panchnad or ‘panch kui’ (five wells) on foot.
The total length of the bridge is 166 metres and its width is 2.4 metres. It has the capacity to carry 25,000-30,000 persons an hour on foot.

– DeshGujarat
Recent Stories
- Poaching at Nalsarovar: 29 Birds Recovered, Four Dead
- Two Booked for Allegedly Duping Gujarat Cops by Promising Favourable Postings
- India’s First Barrier-Less Choryasi Toll Plaza sees 3.69 lakh toll violations in 3 months
- Torrent Power Hikes Fuel Surcharge in Ahmedabad, Surat; Electricity Bills to Rise
- Visitors Enter Hippo Enclosure at Kamatibaug Zoo in a Security Lapse in Vadodara
- Vadodara to get ₹12.70-crore crocodile-themed bridge at Sayajibaug
- Night Temperatures Drop Across Gujarat; Ahmedabad, Vadodara Near 15°C
- Gujarat MLA Jayesh Radadiya Begins Padayatra from Jamkandorna to Shrinathji
- Pakwan Crossroads on SG Highway to Go Signal-Free
- Indian Army Aircraft Land on Amritsar-Jamnagar Expressway in Gujarat
- Vantara Signs 10-Year MoU with Madagascar for Wildlife Conservation
