85% portion of Statue of Unity ready; Inauguration on 31st October
June 12, 2018
Vadodara: Prime Minister Narendra Modi is likely to dedicate the 182-meter tall Statue of Unity on October 31, the 143rd birth anniversary of Sardar Vallabhbhai Patel.
The foundation of the statue was laid at Sadhu Bet, 3.32 km from Sardar Sarovar Dam on Narmada river at Kevadia colony by Modi as then chief minister of Gujarat, on October 31, 2013.
The statue is 85% complete. Fixing of outermost bronze layer parts is going on at present. The ‘dhoti’ part of statue is nearly complete with outer shape ready. Bronze parts for outer layer are being brought from Waghodia based godown with the help of heavy cranes and trucks.
Engineering major L&T and SSNNL(Sardar Sarovar Narmada Nigam Ltd) are implementing the project which involves
a viewing gallery, a tribal museum, a laser light and sound show on the life of Sardar Patel.
Works for a residential facility named as ‘Bharat Bhavan’, four-lane road to the site, broad gauge railway line connecting to Mumbai – Delhi route, valley of flower are going on.
A team of the Airport Authority of India(AAI) is also going to visit the site to check whether sea-plane connectivity to the site is possible from Ahmedabad based Sabarmati Riverfront.
DeshGujarat
Recent Stories
- 20 years imprisonment to sacked IPS Sanjiv Bhatt for planting drugs
- Movie theater, PG hostel, Game Zone in TRP mall sealed by AMC
- Adani’s copper unit in Mundra begins operations
- Gujarat Super League to Revolutionize Football Landscape in Gujarat
- Patil takes data and mathematics class of party office-bearers in Rajkot
- Gandhinagar Municipal Corporation becomes Congress-mukt
- Panchmahal Congress candidate faces trust deficit among section of party workers