PM Modi to dedicate a mega solar power plant in Jamnagar
October 07, 2022
Jamnagar: Prime Minister Narendra Modi will dedicate a mega solar power plant at Haripar village in Jamnagar on 10th October. The 40-megawatt solar power plant built at a cost of over Rs 176 crore has been set up within 3 months. Over 105 million units of electricity will be produced every year due to the photovoltaic grid connected solar plant built in the stony wasteland of the government in Haripar by GSECL. There will be a decrease of carbon dioxide emission of over 84 metric tons. DeshGujarat
PM Narendrabhai Modi to dedicate a mega solar power plant in Jamnagar https://t.co/NXi8RyxA5w pic.twitter.com/9dbO3ZSJaN
— DeshGujarat (@DeshGujarat) October 7, 2022
Recent Stories
- Gujarat Crosses 1 Crore Registered Stock Market Investors
- NHAI suspends contractor, authority engineer, NHAI official for poor work on Amritsar-Jamnagar Expressway in Gujarat
- BJP MPs walk out of parliamentary panel meet over Medha Patkar’s presence
- Traders shut shops in protest after MNS workers slap Gujarati shopkeeper over Marathi
- Gujarat High Court extends Asaram's interim bail
- Gujarat rolls out Ring-Fencing Digital Wallet Transfer System: 50K women to benefit
- Gujarat spent ₹699 crore on dam repair & maintenance in two years; ₹501 crore allocated for 2025-26