Shastri Bridge set to undergo 6-month repair work; Rs. 6 Crore tender approved
August 17, 2023
Ahmedabad: The Shastri Bridge over the Sabarmati River is set to undergo essential repairs to ensure its continued safety and functionality. Starting next week, the bridge will be closed for a period of six months to facilitate comprehensive restoration efforts.
The central authorities have approved the repair of the bridge. The tender for the bridge’s repair has been approved with the estimated cost for the repair being Rs 6 crore. For the duration of the repairs, a diversion route from Vishala to Narol will be established to manage traffic flow effectively
In the month of June, a picture of this bridge, which connects the Vishala area of Vasna in Western Ahmedabad to the industrial areas of Narol and Pirana in Eastern Ahmedabad, went viral. The viral photograph highlighted the need for joint repairs on the 40-year-old bridge.
During that time, the National Highway Authority of India (NHAI) had also erected a barrier to restrict the movement of heavy vehicles like trucks and buses. The bridge has been making headlines for the past two years due to its poor condition. The Amdavad Municipal Corporation (AMC) has repeatedly approached the NHAI for its repair, and now the repair process will finally begin. DeshGujarat
Related Stories
Closed side of Shastri Bridge in Ahmedabad opened for traffic after repairs
Commuters face trouble as one side of Shastri Bridge in Ahmedabad shut since Dec 23
One side of Shastri bridge in Ahmedabad to shut for four months
NHAI erects barrier to restrict heavy vehicle movements on Shastri bridge
Pictures of Shastri bridge of Ahmedabad go viral online; tender process for its rehabilitation by NHAI underway
Recent Stories
- 11 Flights from Ahmedabad Airport Cancelled Amid Airport Closures
- IMD Forecasts Heavy Rains, Thunderstorm in Parts of Gujarat
- Gujarat Cancels Police Leave, Increases Coastal Security Amid Tension with Pakistan
- Reliance Industries has no intention of trademarking Operation Sindoor: Statement
- Catch the Rain–Sujalam Sufalam Jal Abhiyan 2.0 completes 1 month; 1300+ works in action, 317 completed: Gujarat govt
- India foils Pakistan's attempt to attack Bhuj and other cities
- CBI searches at multiple locations in Gujarat linked to ex-IRS officer Santosh Karnani