6-lane Narol – Vishala – Sarkhej elevated corridor, 8-lane Shastri bridge; PM performs virtual Bhumi pujan
March 11, 2024
Ahmedabad: Prime Minister Narendrabhai Modi performed a virtual Bhoomi poojan of the proposed 10.170 km elevated corridor and bridge projects in Ahmedabad via video conferencing. The proposed elevated corridor will connect Narol junction to Sarkhej junction in the city.
It will come up on National Highway 47. The proposed project includes an 8-lane Lal Bahadur Shastri bridge. The elevated corridor starting from Narol junction to Sarkhej junction shall be six-lane. It will also cover the Vishala to Sarkhej route via Juhapura.
The project will come up at a total cost of Rs. 1,295 crore. The project involves the construction of a 4.84 km long elevated corridor from Vishala to Sarkhej via Juhapura road, a flyover at Pirana crossroads and another flyover at Kozi hotel, and an 8-lane Shastri bridge over river Sabarmati.
The Prime Minister also virtually performed Khat Mahurat of four-lane works on the Satlasna – Kheralu highway on national highway 58 and 10 meters widening of Gavadka-Bagasra section nH 351 (package-3) in Gujarat.In total Rs. 1575 crore national highway projects will see khat mahurat. DeshGujarat
Related Stories
HG Infra Engineering bags ₹781 crore Narol-Sarkhej Highway upgrade project
HG Infra Engineering emerges as lowest bidder for Narol-Sarkhej Highway upgrade project
PM GatiShakti: Centre reviews 6-lane Narol – Vishala – Sarkhej elevated corridor project
Recent Stories
- Rahul Gandhi to be on Gujarat visit on April 15–16
- Bridge City Surat likely to get one more bridge on April 18th
- Former MLA Mahesh Vasava quits BJP
- Work begins on 1.3-km tunnel in Poshina for Taranga Hill–Ambaji–Abu Road rail project
- AUDA to repair 3 bridges on SP Ring Road
- Gabbar Hill darshan, Parikrama route, Ropeway to remain shut from April 15-17
- Western Railway to run Udhna–Danapur Unreserved Special Train