Bullet train project: Construction of River Bridge on Dhadhar River completed
June 14, 2024
Vadodara: River bridge on Dhadhar River, Vadodara district, Gujarat has been completed for Bullet Train project.
Salient features of Dhadhar River bridge are:
-Length: 120 meters
-Consists of 3 Full Span Girders (40 meters each)
-Height of Piers – 16 m to 20 m
-Circular piers of 4 m and 5 m diameter (4 Nos.)
-This bridge is in between Bharuch and Vadodara bullet train station
There are total 24 river bridges on Bullet Train corridor (Gujarat and Maharashtra) out of which 20 are in Gujarat and 04 are in Maharashtra.
The construction of seven river bridges on Par (320 m, Valsad district), Purna (360 m, Navsari district), Mindhola (240 m, Navsari district), Ambika (200 m, Navsari district), Auranga (320 m, Valsad district), Venganiya (200 m, Navsari district) and Mohar River (160 m, Kheda district) has already been completed. DeshGujarat
Related Stories
Bullet Train Project: Naroli - Bhilad Road to close for 18 days
Mumbai - Ahmedabad Bullet Train Project: work begins on India's first undersea rail tunnel
Recent Stories
- Gujarat Board Class 10 Exam 2025 Results Online on May 8
- Jam Saheb writes to PM Modi after precision strike, lauds Indian Armed Forces
- Anand man booked for giving triple talaq to wife via post
- Western Railway announces mega blocks in Geratpur–Vadodara section; several trains affected
- Red Alert in parts of Gujarat; Severe Thunderstorm, Heavy Rain likely over next 24 hrs
- Mumbai–Gandhinagar Vande Bharat Express to have more coaches, more seats
- District-wise blackout mock drill timings across Gujarat