Western Railway conducts Speed Trial on Adaraj Moti–Vijapur Broad-Gauge Line in Ahmedabad division
December 23, 2025
Ahmedabad: As part of the Adaraj Moti–Vijapur gauge conversion project, Western Railway’s Ahmedabad division recently conducted a successful speed trial on the newly converted broad-gauge railway line. A locomotive was run at a maximum speed of 136 km per hour on the Adaraj Moti–Vijapur section, marking a key milestone in the project.
The trial was conducted between kilometer 6/4 and kilometer 45/1 using a light engine. During the test, the track was thoroughly inspected by departmental trains, measuring instruments, and a team of technical experts to ensure safety, stability, and operational readiness.
Once operational, this railway line will be directly connected to the recently gauge-converted Ambaliyasan–Vijapur line, paving the way for faster, safer, and smoother train operations. The new broad-gauge connectivity is expected to benefit Ambaliyasan and the rural areas of North Gujarat, offering passengers a time-saving, secure, and convenient travel option.
Railway officials highlighted that speed trials are a crucial technical procedure conducted to verify the quality, stability, and safety standards of newly converted tracks before regular train services commence. DeshGujarat
Recent Stories
- Gujarat Tops India in Mineral Block Auctions in FY 2025–26 with 32 Blocks
- Nestle India Invests ₹225 Crore to Expand Sanand Factory
- Widespread Unseasonal Rain in Gujarat; 24-Hour Rainfall Data Here
- GujRERA orders refund with interest to 24 buyers in GIFT City WTC project
- 50 Key Highlights of Gujarat’s UCC Bill 2026
