Vadodara – Godhra Stretch of Delhi-Mumbai Expressway Set for Official Opening on May 20
May 19, 2026
Vadodara: Around a month after being opened on a trial basis, the Vadodara-Godhra section of the Delhi-Mumbai Expressway is scheduled for its official inauguration on May 20.
The stretch, which includes Packages 29, 30, and 31 of the Vadodara–Virar section of the nation’s largest greenfield expressway, has been open for public trials since April 13. The official opening on Wednesday will mark the full commencement of formal operations. The expressway has reduced travel time between the two cities in central Gujarat to around 45 minutes, providing a high-speed link for thousands of daily commuters.
During the trial phase, essential emergency facilities such as crane services and ambulance support were not fully available. These are expected to be integrated as part of the official launch.
A major highlight of this engineering project is its intersection with another landmark infrastructure initiative the Mumbai-Ahmedabad Bullet Train corridor. At this location, a massive steel bridge has been constructed over the expressway. The bridge was specifically designed with large support pillars and advanced engineering technology to ensure that the bullet train infrastructure does not interfere with traffic movement on the expressway below.
Once fully completed, the 1,386-kilometre expressway will connect Delhi, Haryana, Rajasthan, Madhya Pradesh, Gujarat, and Maharashtra, significantly transforming the nation’s logistics and transportation landscape. DeshGujarat
Leave a Reply
Related Stories
Google Maps now showing the newly opened Godhra-Vadodara stretch of Delhi-Mumbai Expressway
Delhi-Mumbai Expressway: Godhra - Vadodara Section Cuts Travel Time to 45 Minutes, Say Commuters
Delhi - Mumbai Expressway : Latest Package-wise Update on Gujarat Section
Godhra - Vadodara Section of Delhi - Mumbai Expressway Opens to Traffic on Trial Basis
Recent Stories
- Ahmedabad Civic Body Plans Key Road-Widening Project in Raipur
- AMC to Lay New Eastern Trunkline in Next Two Years to Tackle Waterlogging
- Ahmedabad Civic Body to Procure 104-Metre Fire Crane; Revises Charges for Outstation Fire Calls
- AMC Imposes ₹50 Lakh Penalty on Naroda Flyover Contractor for Delay
- Ahmedabad Firm Accused of ₹41.44 Crore Bank Fraud; Three Partners Booked
- AMC Monsoon Control Room 2026 Helpline Numbers Declared
