Union Cabinet Approves Ahmedabad Metro Phase 2A Corridor from Koteshwar Road to Airport
June 10, 2026
New Delhi: The Union Cabinet chaired by the Prime Minister Narendra Modi has approved Phase 2(A) of the Ahmedabad Metro Rail Project with a corridor for a length of 6.032 km with 05 stations (04 elevated and 01 underground). On operationalisation of Phase 2(A), Ahmedabad-Gandhinagar will have 77.63 km of active metro rail network. The names of stations in the Phase 2(A) Corridor are Ashram Road, Koteshwar Prachin Mandir, Sabarmati River, Sardar Nagar and Airport.
The total completion cost, including IDC (Interest during Construction) for the project, will be Rs.2,169.04 crore.
Enhanced Connectivity:
Phase 2(A) of the Ahmedabad Metro Project envisages the development of approximately 6.032 km of new metro corridor, aimed at substantially enhancing public transportation by providing seamless connectivity to the airport and linking key residential and commercial areas that presently lack efficient transit access.
This phase aims to seamlessly integrate key zones, including residential & commercial hubs, with the existing Ahmedabad-Gandhinagar corridor. Further, there is a likelihood of sports facilities also being developed in the vicinity for the World Police Games 2029 and Commonwealth Games 2030.
By bridging these vital areas with the metro network, Phase 2(A) will not only enhance connectivity but also stimulate economic activity and tourism and ease urban mobility for both residents and visitors.
Reduction in Traffic Congestion: Metro Rail as an efficient alternate road transport and with Phase 2(A) as an extension of the Metro Rail network to the airport will be particularly impactful inside Ahmedabad. Reduction in road traffic can lead to smoother movement of vehicles, reduction in travel time, increasing overall road safety, etc.
Environmental Benefits: With the addition of Phase 2(A) of the Ahmedabad Metro Rail Project and an increase in the overall Metro Rail Network in Ahmedabad & Gandhinagar cities, it can significantly reduce carbon emissions compared to traditional fossil fuel-based transport.
Economic Growth: Reduced travel times and improved access to different parts of the city such as airports, railway stations and bus depots can enhance productivity by allowing individuals to reach their workplaces and destinations more efficiently. Also, the enhanced connectivity can stimulate local businesses, especially in areas near new metro stations, which can also attract investment and development in previously less accessible regions.
Social Impact: The expansion of Phase 2(A) Metro Rail network in Ahmedabad will provide more equitable access to public transport, benefiting diverse socio-economic groups and reducing transport disparities, which will contribute to a higher quality of life by reducing commute times and improving access to essential services.
Phase 2(A) of the Ahmedabad Metro Rail Project is set to be a transformative development for the city. It promises to deliver enhanced connectivity, reduced traffic congestion, environmental benefits, economic growth, and improved quality of life. By addressing key urban challenges and providing a foundation for future expansion, Phase 2(A) will play a crucial role in shaping the city’s development trajectory and sustainability.
The Ahmedabad Metro Phase 2A will generate employment of around 2,000 persons during the peak period of construction activity, and 500 persons are likely to work during operation & maintenance of the system.
Route Map:
Recent Stories
- Pet Rottweiler Dog Attacks 9-Year-Old Child in Vastrapur; Owner Booked for Negligence
- First Made-in-India C-295 Aircraft Takes Test Flight from Vadodara Airport
- Gujarat HC Orders Company to Pay "Housekeeping" Bills for Nike Shoes, Raymond Suits, and International Trips
- Gujarat Police Trace 1,470 Missing Persons in Month-Long Operation Milap
- BCA Election Chaos: Ballot Boxes Locked in a School Room Costing ₹10 Lakhs a Month
- GSRTC Expands Ahmedabad–Vadodara AC Volvo Bus Service to 10 Daily Trips
