Gujarat aims to end water woes of Saurashtra with SAUNI scheme
August 29, 2016
Ahmedabad: In its bid to solve water woes of parched Saurashtra, the first phase of Gujarat government’s SAUNI scheme which plans to fill 115 dams of the region with excess water from the Sardar Sarovar dam, will be launched in Jamnagar by Prime Minister Narendra Modi on August 30.
Under Saurashtra Narmada Avtaran Irrigation Yojna (SAUNI), which could become a milestone in water engineering, the state government envisages to fill 115 dams with excess overflowing water of Sardar Sarovar dam across river Narmada by a web of pipeline networks.
Modi, in 2012, then chief minister of Gujarat, had launched the scheme, to be developed at a cost of Rs 1,200 crores.
“The phase-I of the project is complete. The Prime Minister will inaugurate it. As many as 10 dams will be filled upto the brim in the first phase. We plan to fill 115 dams of Saurashtra region. The four-phased project is expected to be completed before 2019,” Chief Minister Vijay Rupani said.
“It will irrigate over 4 lakh hectares of land and solve the water problem of the region to a large extent,” he said.
During monsoon, on an average around three MAFt (million acre feet) water overflows from Sardar Sarovar dam and flows into sea.
The government plans to transfer one MAFt of excess water to dams of Saurashtra, using existing canal networks and then laying a web of pipelines to fill dams that are located in the range of 300 to 500 kms from Sardar Sarovar dam.
Saruashtra, which comprises 11 districts, faces drought like situation often and has been reeling under severe water scarcity due to scanty rainfall in the last two years.
Sharing details of the project, an Irrigation department official said four trunk pipelines (with diameter of three meters) will be laid. Link 1 of 180 Kms will connect Machhu II dam of Morbi district to Sani dam of Jamnagar district. Link II of 253 kms will connect Limbdi Bhogavo-II dam of Surendranagar district to Raidi dam of Amreli district.
Link III of 245 kms will start at Dholi Dhaja Dam in Surendranagar and end at Venu I dam of Rajkot district, while Link IV of 250 kms will connect Limbdi Bhogavo II dam of Surendranagar to Hiran II dam of Gir Somnath district, the official said.
Smaller width pipelines will be diverting waters from these main trunk lines to various dams of Saurashtra. Dams like Dholi Dhaja, Limbdi-Bhagova and Machhu II are already getting water of Sardar Sarovar dam through canal network of the dam.
Most of the water will be pumped by motors to travel through these pipeline network through pumping stations built at various points.
Notably, water has become a politically sensitive issue in Gujarat, which the BJP plans to cash in before the 2017 Assembly polls to revive its fortune, specially at the time when it is facing challenges like Patel quota agitation and Dalit uprising.
PTI
Related Stories
CM orders to complete SAUNI phase-2 by August 15 this year and phase-3 by March next year
Prime Minister Narendra Modi on two-day visit to Gujarat on 16-17 April
Girls made India proud at Rio Olympics: Modi
Earlier Mahi and Sabarmati and now six more rivers connected to Narmada: PM Modi expresses pleasure
PM Modi explains why he was not visiting Gujarat much, says will not give chance to complain now
Who gave ticket to Medha Patkar? Who didn't allow Narmada dam height to increase? Vijay Rupani slams opposition in SAUNI function speech
PM Narendra Modi dedicates first phase of link-1 of SAUNI project at Aaji-3 dam site
Live in video: Prime Minister Narendra Modi inaugurates SAUNI Yojana in Gujarat
PM Narendra Modi arrives at Jamnagar to inaugurate SAUNI, says this scheme will truly benefit the people of Gujarat
PM to inaugurate first phase of SAUNI project in Gujarat
Countdown begins for SAUNI yojana function in presence of PM in Gujarat today
More details on SAUNI link to be opened by Prime Minister on 30th August in Gujarat
Narmada water inflow initiated into dams of Saurashtra, overflow when PM comes on 30th: Rupani
PM Narendra Modi to inaugurate first link of SAUNI on August 30 in Gujarat
'3 reservoirs to be connected to Narmada water grid in August under SAUNI'
Inclusion of two Talav in Bhavnagar region likely in SAUNI Yojana
SAUNI project: First major breakthrough likely by end of this year
"If there were no bulk pipelines, migration was the only option for people of Saurashtra"
SAUNI project updates
Irrigation strenth of Gujarat up by 49% in 12 years:Minister
Essar Steel bags 1.2 lakh tonne of steel pipes order for SAUNI project
Narendra Modi speaks after laying foundation stone for SAUNI project(video)
Narendra Modi to lay foundation stone of SAUNI in Rajkot today
Within this year, Machhu-1, Machhu-2 to become first beneficiaries of ambitious SAUNI Yojana
Saurashtra Narmada Avtaran Irrigation (SAUNI) Yojana: Gathering of Five lakh planned in Saurashtra in May 2013
Narendra Modi reviews water grid works in Saurashtra/Kutch(Video)
Narendra Modi declares Rs 10,000 crore Sauni Yojna to fill 115 dams of Saurashtra with Narmada water (Video)
Recent Stories
- IAS officer Mona Khandhar appointed as Chairman of Gujarat Panchayat Service Selection Board
- It is a kind of moral science lesson: Gujarat HC on plea against Bhagavad Gita teaching in schools
- RBI imposes monetary penalty on 4 cooperative banks in Gujarat
- BJP MP Mansukh Vasava dismisses Bhil Pradesh demand as 'preposterous', urges tribal unity
- Road from expressway to Amit Nagar circle closed; Vadodara police announce alternate routes
- Increased scrutiny delays PM-JAY approvals in Ahmedabad hospitals
- AMC to develop Lotus Park, 'Kausum: Garland of India,' on SG Highway