How final raising of Sardar Sarovar Dam cleared by Narmada Control Authority; an official note
June 17, 2017
New Delhi: Narmada Control Authority (NCA) has cleared the final raising of Sardar Sarovar Dam (SSD) in Gujarat by lowering of gates and impounding of water in the reservoir upto its Full Reservoir Level (FRL) of EL 138.68 mts.
The NCA which met here yesterday under the Chairmanship of Dr. Amarjit Singh, Secretary (WR, RD & GR) considered all aspects of environmental and Resettlement and Rehabilitation (R&R) issues.
It may be recalled that the last time raising of SSD was cleared on June 12,2014, wherein permission for Phase-I construction of piers, overhead bridge and installation of gates in open or raised position was granted. At that time, the effective height of SSD remained at EL 121.92 mts. with backwater levels of EL 134.32 mts. at dam site.
With lowering of gates of SSD, the live storage capacity would increase from 1565 to 5740 MCM i.e. by 4175 MCM (267%). The clean (hydro-power generation) would increase by present 1300 MW to 1450 MW with increase in annual generation by about 1100 Million Units (i.e. about Rs.400/- crore per annum).
In addition, this additional storage would irrigate about 8 lakh hectares. Additionally, about one crore population would get assured drinking water. As it is well known, the Sardar Sarovar Project would primarily meet the water requirement of drought prone and desert areas of Gujarat and Rajasthan.
Prior to clearance by NCA, the Environment Sub-group of NCA chaired by Shri Ajay Narayan Jha, Secretary (MoEF&CC) reviewed the implementation of Environment Safeguard Measures on May 01,2017 and after observing substantial progress, recommended Phase-II proposal of lowering down of the gates and impounding of water in the reservoir to FRL of EL 138.68 mts. The Environment Sub-group has also asked the State Governments to complete leftover works by June 30,2017.
The Resettlement and Rehabilitation sub-group chaired by Smt. G. Latha Krishna Rao, Secretary (MoSJ&E) reviewed the progress of R&R and the opinions received from Grievance Redressal Authorities (GRAs) of the States of Gujarat, Madhya Pradesh and Maharashtra on June 16, 2017. The State Governments have assured to address all issues of Project Affected Families (PAFs) on priority basis in accordance with Narmada Water Disputes Tribunal (NWDT) Award, liberalized policies of the State Governments and Supreme Court Order dated February 08,2017.
NCA has permitted final raising of SSD after following the procedure laid down by Supreme Court order dated October 18, 2000 in WP(C) 328 of 2002 in Narmada Bachao Andolan Vs. Union of India & others.
PIB
Related Stories
Centre approves Rs 730.90 crore assistance for Narmada canal construction: Gujarat govt conveys thanks to PM
In a political suicide, Gujarat Congress supports Medha Patkar to defend Rajeev Satav
PM Narendra Modi to inaugurate the Narmada dam in Gujarat on his birthday
With closure of gates of Narmada dam , average annual overflow would be drastically shorter
A historic day for Gujarat; closure of 30 gates on Narmada dam initiated today morning
Have a look at big benefits closure of Narmada dam gates will bring to Gujarat
Permission for closure of Narmada dam gates likely after March 2017: Anandiben
Installation of gates over Narmada dam to be completed 8 months ahead of schedule:CM
Process of installation of gates over Narmada dam begins
Installation of gates over Narmada dam likely to begin in October
Installation of gates over Narmada dam likely to begin in October
Phase one permission is about keeping gates in raised position
NCA permits installation of gates over Narmada dam
Countdown begins for gates installation work at Narmada dam
Centre's approval to Narmada dam gates soon: Anandiben at Morbi
Gujarat BJP MPs meet PM over Narmada gates issue
Modi urges PM to permit early completion of gates at Narmada dam(VIDEO)
Recent Stories
- Bus from Gujarat to Ayodhya meets with accident; 50 injured
- PM Modi meets Padma Bhushan Jain Acharya Ratnasundersurishwarji Maharaj
- Update on work in progress on Vadodara-Godhra section of Delhi-Mumbai Expressway
- Portion of Ashram Road near Sabarmati Gandhi Ashram to shut permenently from Nov 9; details of alternate routes and parking
- A lucky car given Samadhi with last rites ceremony as per Hindu customs in rural Amreli
- CR Patil attacks Congress, National Conference over J&K Assembly's Article 370 resolution
- Three-day tribal trade fair begins in Navsari