Railways completes ‘Kavach’ loco trial in Ahmedabad – Vadodara section
July 31, 2024
Ahmedabad: Loco trial of Kavach system has been succesfully completed on the 96 km route connecting Ahmedabad to Vadodara (Automatic signaling) section by Western Railway. On Vadodara – Surat – Virar (automatic signalling) section, 201 km work of Kavach is completed out of total 336 kms. In the case of situation of potential accident, Kavach applies automatic break and control the speed of the train. Kavach also would be helpful for smooth operations of trains in bad weathe conditions. A make in India technology ‘Kavach’ is helping the Indian Railways in achieving zero accident goal. DeshGujarat
Recent Stories
- Stray bull attacks man in Bhachau, Kutch; CCTV footage surfaces
- In pictures: Upcoming Five-Star Hyatt Hotel at GIFT City, Gujarat
- Ahmedabad girl jumps from building after being blackmailed with intimate video; two booked
- Gujarat gets widespread rain on Saturday; Dwarka tops with 4.45 inches
- No RTO visit needed: Gujarat launches faceless learning license system
- Western Railway announces block on July 6; several Gujarat-passing trains to be affected
- IMD forecasts heavy rains in these parts of Gujarat till July 11 | Weather | मौसम | હવામાન