Articles tagged under: Bhuj Airport

Aircraft grounded at Surat airport after suffering tail strike at Bhuj Airport

August 14, 2024
Aircraft grounded at Surat airport after suffering tail strike at Bhuj Airport

Surat: A six-seater aircraft of renewable energy firm owner suffered tail strike during takeoff on 3rd August at Bhuj airport. The aircraft is grounded at Surat airport. The plane was taking off at Bhuj airport on 3rd August when its tail collided with the airport runway in Bhuj. A pilot didn't realize about this and landed safely at Surat airport. When the plane landed at Surat airport, some parts of the tail portion were found on the runway. They were handed over to the pilot by the airport st...Read More

Air India launches Bhuj-Mumbai direct flight service

March 01, 2024
Air India launches Bhuj-Mumbai direct flight service

Bhuj: Air India today launched its daily direct flight service connecting Bhuj and Mumbai. The inaugural flight, upon arrival at the Bhuj airstrip, was given a water salute. According to the airline website, the daily flight will take off from Bhuj Airport at 8:55 am and land in Mumbai at 10:10 am, with a total flight time of 1 hour 15 minutes. Meanwhile, the return flight will depart from Mumbai at 7:05 am and reach Bhuj Airport at 8:20 am. DeshGujarat  Read More

Bhoomi Pujan performed for expansion and renovation of Bhuj airport terminal

February 24, 2024
Bhoomi Pujan performed for expansion and renovation of Bhuj airport terminal

Bhuj: Airport Authority of India (AAI) performed ground breaking for expansion of the terminal of Bhuj airport in Kutch. Ground breaking was performed on Friday to expand the terminal from 540 passengers capacity today to 1200 passengers capacity in future. आज भुज विमानपत्तन पर टर्मिनल बिल्डिंग के पुनर्निर्माण कार्य के लिए विमानपत्तन निदेशक तथा...Read More