In pictures: A glimpse of revamped stretch of CG Road in Ahmedabad
April 25, 2019
Gandhinagar: Amdavad Municipal Corporation is revamping city’s CG Road as smart road. A 50 meter stretch close to Stadium six road has been revamped. Next stretch where revamp work is underway is located opposite Parimal Garden. Rs. 33 crore project will eventually cover entire CG Road which was designed and developed lastly in 1995. The new design includes wider footpath, organized plantation, sitting benches, dustbins with two compartments and more. The project according to Municipal Commissioner Vijay Nehra will complete by December 2019. The motor vehicle lane will remain the same.
Highlights
Wide 12-15 feet sidewalk
-Enforcement by design
-Planters and benches
-New large trees
-Bollards for pedestrian safety
-Curbside Parking
-Aesthetic lamps
-Sturdy dustbins
-Utility duct
-Storm water drains
Recent Stories
- Schedule of Visit of Pedro Sanchez, President of Spain in Vadodara
- Railways restricts platform tickets sale at Surat, Vapi, Valsad, Udhna stations due to heavy rush
- Western Railway to run additional Udhna - Gorakhpur special train from Surat
- Ahmedabad Airport opens expanded departure space in terminal 2
- ACB Gujarat arrests Range Forest Officer and his aide in bribe case
- ACB Gujarat nabs PSI in bribery case in Ahmedabad
- Girnar Ropeway ticket fare hiked