Sabarmati over bridge to remain shut for repair during 4-6 November
November 04, 2023
Sabarmati: Sabarmati overbridge near the power station will be shut for traffic after the England-Australia World cricket match, till November 6 for repair and road surfacing. The road was to shut from 3rd November, however, due to the cricket match nearby at Motera stadium, the bridge will now be shut for repair after the match is over.
The bridge connects Sabarmati to the RTO circle. It will be shut from the night of 4 November to 9 am on 6t November. The repair works include resurfacing using the milling method and patchwork. Commuters are asked to use alternative routes in the absence of this stretch. The repair works will be executed by the Amdavad Municipal Corporation(AMC). The bridge is located over the Ahmedabad-Delhi main railway line, close to Sabarmati railway station and Torrent power station. DeshGujarat
Recent Stories
- BJP wins Vav assembly by-election in Banaskantha
- Progress update of Vadodara - Dahod - MP Border section of Delhi-Mumbai Expressway
- Thaltej Gam Metro Station ready; likely to open in December 2024
- Over 5 lakh tourists visit Rani ki Vav in Gujarat in two years
- Vav Assembly seat by-election 2024 live results
- Gujarat ministers hold 4 group discussions in Chintan Shivir at Prabhas Patan
- Experts from Kochi visit Surat for feasibility survey of water metro along Tapi