Gogha-Dahej Ro-pax ferry service, the pet project of PM Modi, resumes in gulf of Cambay
December 14, 2018
Bhavnagar: The Ro-Pax ferry service, the largest one across the country, between Bhavnagar and Ghogha, which was put on halt since November 21 due to technical problems in the ship used for it, resumed from today.
Senior officer of the Ferry operating company Indigo Seaways Pvt Ltd (ISPL), D K Manral today said that the vessel has got clearance for ferry after repair and 3 successful sea trials.
He said that the third and final sea trial was conducted on December 12 in presence of Indian Register of Shipping (IRS) Surveyor.
He said that there will be two daily round trips (in all four trips) of the Ro-pax ferry again.
SCHEDULE-
Trip 01 – Departure from Ghogha : 08:00 Hrs.
Arrival at Dahej : 1000 Hrs
Trip 02 –
Dep Dahej : 11:30 Hrs.
Arr Gogha: 13:30 Hrs
Trip 03 –
Dep Gogha:16:00 Hrs.
Arr Dahej : 18:00 Hrs
Trip 04 –
Dep Dahej : 19:30 Hrs.
Arr Gogha : 21: 30 Hrs
For the night 2130 Hrs to 0800 Hrs ,Vessel along side at Gogha Berth.
Notably, the cooling system of the ship failed on November 21 mid sea with 461 passengers on board. It was tugged back to Ghogha. The operators had alleged that muddy water due to less depth in the sea channel near terminals had caused the problem.
The original Ro Ro service with passengers only ship was inaugurated on October 22 last year by PM Narendra Modi and the Ro-Pax version capable of ferrying vehicles and cargos also was started on October 27 this year. The Ro-Ro service was also stopped from November 25 for routin.
Related Stories
Dahej - Ghogha RORO ferry service to resume from February 24
Ro-pax ferry service between Ghogha-Dahej to resume in gulf of Cambay from December 14
Dahej - Ghogha Ro-Ro ferry service paused for 3 days for maintenance
Dahej - Ghogha Ro-Pax ferry likely to resume service from December 7, Ro-Ro ferry functional regularly
Dahej - Ghogha ro-pax ferry ship halted in sea after high temperature alarm rings
Dahej - Ghogha ro-pax ferry service timings to change from 1 December
Recent Stories
- Cyclists hit by overspeeding SUV on SG Highway based overbridge
- Gujarat govt to form AI Task Force
- Khambhat police book 31 for attacking police personnel
- BJP wins Vav assembly by-election in Banaskantha
- Progress update of Vadodara - Dahod - MP Border section of Delhi-Mumbai Expressway
- Thaltej Gam Metro Station ready; likely to open in December 2024
- Over 5 lakh tourists visit Rani ki Vav in Gujarat in two years