KP Energy’s 54.6 MW Wind Power projects operational in Gujarat
March 07, 2024
Dwarka: KP Energy Limited has operationalized 54.6 MW wind power capacity as part of Phase VI and VII within the 250.8 MW inter-state transmission system (ISTS) connected wind power project (CLP India) located at the Sidhpur site in Devbhoomi Dwarka.
This commissioning includes a 25.2 MW wind power project in Phase VI, comprising 12 wind turbine generators (WTGs) with a capacity of 2.1 MW each. Additionally, the second project involves of a 29.4 MW wind power project in Phase VII, featuring 14 WTGs with a capacity of 2.1 MW each.
The overall project contributes to the 250.8 MW ISTS-connected wind power initiative, developed on a build, own, and operate basis under Tranche VIII of ISTS-connected wind power projects by the Solar Energy Corporation of India Limited at Sidhpur in Dwarka. DeshGujarat
Recent Stories
- Cyclists hit by overspeeding SUV on SG Highway based overbridge
- Gujarat govt to form AI Task Force
- Khambhat police book 31 for attacking police personnel
- BJP wins Vav assembly by-election in Banaskantha
- Progress update of Vadodara - Dahod - MP Border section of Delhi-Mumbai Expressway
- Thaltej Gam Metro Station ready; likely to open in December 2024
- Over 5 lakh tourists visit Rani ki Vav in Gujarat in two years