Build Narmada bridge on Ahmedabad-Mumbai highway at Chinese speed
January 18, 2015
Vadodara, Editor’s note
Traveling between Ahmedabad and Mumbai by road has been like a hell due to same old problem – traffic jam on both sides of Narmada river bridge in Bharuch.
For last seven days, at least 10-km long traffic jam has been witnessed continuously due to ongoing repair work of Sardar bridge. And there’s no exaggeration in this statement.
Existing Sardar bridge over river Narmada is so old and inefficient that practically it is beyond repair. When you pass on this bridge, it literally shakes up. It is due to absence of any other alternative route, the government keeps repairing Sardar bridge every now and then. Every repair work causes traffic jam on both sides for kilometers and for hours and days! The present repair work has taken seven days so far!
This stretch which is a part of the busiest highways in India falls under central government’s purview. It is centre’s responsibility to build a new bridge here. The UPA government in centre was so inefficient that its one of the top leaders and Rajya Sabha MP elected from Gujarat Ahmed Patel who belongs to Bharuch had to issue a threat to his government that he would go on fast and dharna if new bridge project is not executed in speed(in 2010 Rs. 450 cost was sanctioned and work was allotted to HCC, but they backed out later for some reasons. The work was later again awarded to L&T at a cost of Rs. 450 crore in 2013 and it started too. At the same time MP Ahmed Patel had compelled to remove the toll booth on this stretch to ease traffic problem.)
UPA has gone, and NDA is here, but construction work for new bridge has not been in progress at satisfactory level! At times it feels the area should be transferred to Chinese administration for fast implementation of river bridge project, because it seems we as a nation are just not capable to execute the project in necessary speed!
Coming back to the immediate issue, the traffic of Sardar bridge has been presently diverted to nearby Golden bridge which is over 100 years old. This bridge is too narrow and can carry only two vehicles side by side. Needless to say that repair work of Sardar bridge has added multi-fold burden to this poor-old-narrow Golden bridge, and as a result, long and terrible queues of vehicles are regular.
According to an order issued by magistrate of Bharuch, Vadodara-Bharuch four-wheel traffic will need to be diverted from Nabipur chowkdi to Dayadara-Hingla chowkdi and Bharuch city. Vadodara-Dahej big size vehicles will need to be diverted from Nabipur to Dayadara and then to Jambusar chowkdi to Dahej. This order will be effective till 11 February. Vehicles to Vadodara could be diverted from Rajpipla chowkdi to Mulad chowkdi via Jhagadia, Rajpardi, Rajpipla.
© Copyright DeshGujarat. All rights reserved. Republication or redistribution of any DeshGujarat content, including by framing or similar means, is expressly prohibited without their prior written consent.
Related Stories
Exemption from toll tax for Bharuch vehicles lifted on Narmada cable stayed bridge post election
Details of largest extra-dosed cable stay bridge in India to be inaugurated by PM Modi
Narmada bridge at Bharuch to be completed before schedule:Gadkari
Ahmed Patel writes to Nitin Gadkari for speedy completion of Narmada river bridge project in Bharuch
Recent Stories
- Gujarat govt to form AI Task Force
- Khambhat police book 31 for attacking police personnel
- BJP wins Vav assembly by-election in Banaskantha
- Progress update of Vadodara - Dahod - MP Border section of Delhi-Mumbai Expressway
- Thaltej Gam Metro Station ready; likely to open in December 2024
- Over 5 lakh tourists visit Rani ki Vav in Gujarat in two years
- Vav Assembly seat by-election 2024 live results