In photos: Construction of Dwarka Sudama setu almost complete
August 21, 2015
Dwarka
Rs 8 crore ‘Sudama Setu’ bridge over the river Gomti to connect Dwarka with Panchnad Tirth is almost built.
Reliance Industries Limited (RIL), in collaboration with the Gujarat Tourism Department and Pavitra Yatradham Vikas Board, is building ‘Sudama Setu’. RIL’s Shri Parimal Nathwani is personally taking interest for speedy implementation of this project.
The construction of the cable-stayed bridge on the river Gomti, connecting Dwarkadheesh’s Jagat Mandir and Panchnad Tirth is likely to be completed before the festival of Janmashtami this year.

The hanging bridge has been named ‘Sudama setu’ in fond memories of friendship of Dwarkadheesh Shri Krishna and Porbandar’s poor Brahmin Sudama.
At present, pilgrims use boats to cross the Gomti river to reach Panchnad on the opposite bank.

Once the ‘Sudama setu’ is completed, the pilgrims will be able to visit Panchnad or ‘panch kui’ (five wells) on foot.
The total length of the bridge is 166 metres and its width is 2.4 metres. It has the capacity to carry 25,000-30,000 persons an hour on foot.

– DeshGujarat
🗃️ This story is from our archives and may contain outdated information.
Recent Stories
- Gujarat leads with distribution of 54000 plus 5 KG LPG cylinders: Govt
- Gujarat Announces Kerosene Distribution Plan for Rural Areas; Launches Online Platform to Apply, Price Fixed
- Congress President Kharge's Illiterate People of Gujarat Can be Fooled Remark in Keralam Triggers Outrage
- 57 Hostel Girls Hospitalized in Ahmedabad Food Poisoning Outbreak
- Priceless Heritage Items Lost as Fire Breaks Out in Historic New Palace in Morbi
