Deadlock over Amreli bus port project ends, work for makeshift bus-stand starts
December 31, 2017
Amreli: Ground breaking for reconstruction of State Transport bus station in district headquarters Amreli had taken place six month ago, but work could not start due to unavailability of alternate land to relocate the existing bus station and its traffic temporarily.
Lately Gujarat State Road Transport Corporation(GSRTC) has now decided to relocate existing bus-station to vacant space behind its workshop area for two years period during which reconstruction of main bus station will take place nearby.
The makeshift bus station will have 10 platforms, 1 canteen, 4 stalls and drinking water facility. It will be constructed in about one month period. Once alternate arrangement of makeshift bus station is in place and it is operational, the reconstruction work at main bus station will start. It will be converted into state-of-the-art bus port in about two years.
DeshGujarat
Related Stories
10 months after ground breaking, Bharuch bus port project kicks off
Nila Infra bags Amreli and Modasa GSRTC Bus Terminal construction projects
Recent Stories
- Mobile video recording in women's washroom at Floatel Lord in Diu; Police case filed after ruckus by tourists
- SMC's fire department gets 70 m high hydrolic platform from Finland
- 2.64 lakh smart meters installed in Gujarat so far agianst total target of 1.65 crore
- Gujarat State GST department searches at 14 Copper firms; One arrested in Surat
- Average 67.13 percent voting recorded till 5 pm in Vav assembly by-poll
- Kanoria Centre for Arts to mark 40th anniversary with week-long celebrations
- PM Modi e-launches 'PM Bharatiya Jan Aushadhi Kendra' at Chandlodia-B Railway Station in Ahmedabad