Construction of new Narmada Maiya bridge in Bharuch 75% over
February 22, 2018
Bharuch: Construction work of new four-lane Narmada Maiya bridge over river Narmada is 75% over. Proposed bridge, once ready, would ease traffic on over 100 years old Golden bridge. As one of the approaches of under-construction bridge touches Shital circle, the buses and other heavy vehicles are to be diverted to other routes during 15 March to 13 April period. Movements of heavy vehicles are banned for 30 days between Kasak circle and Shital circle and between Bholav college U turn to Shital circle. Only two-wheelers will be allowed to pass through the Golden bridge.
DeshGujarat
🗃️ This story is from our archives and may contain outdated information.
Recent Stories
- After Ceramic Sector, Crisis Now Hits Morbi Laminate Industry; Production Down to 50%
- Railways Approves ₹344 Crore Rail-over-Rail Flyover for Kosamba-Umrapada Section in Gujarat
- Minor Hindu girl lured online and raped in Surat; accused faked religion on Aadhaar card using AI
- Devotees Offer 1.9-kg Silver Bow, Arrows to Dwarkadhish at Jagat Mandir
- Western Railway to Conduct Electric Loco Speed Trial on Himmatnagar - Khedbrahma Line
