Paldi underbridge being built by GMRC to be complete soon
June 10, 2023
Paldi: The construction of the Paldi underpass (Juna Shardamandir crossing) by the Gujarat Metro Rail Corporation Ltd (GMRCL) is almost complete after facing many delays.
The underpass connects Paldi char rasta to Law garden and aims to provide improved connectivity for residents of Ambawadi, Law Garden, Paldi, and Navrangpura. Originally planned as a replacement for a level crossing, the underpass now incorporates entry and exit points for the Paldi Metro stations. Being built at a cost of approximately Rs 72 crores, the underpass design integrates the Paldi Metro station entrance and exit, spanning 450 meters with two traffic lanes in each direction. It is expected to alleviate traffic congestion and improve the Metro commuting experience.
Unique construction techniques were employed, including micro-tunnelling and soil nailing, to address soil stability and prevent waterlogging. The underpass is a significant infrastructure project aimed at enhancing transportation in the area.
Recent Stories
- Gujarat govt to form AI Task Force
- Khambhat police book 31 for attacking police personnel
- BJP wins Vav assembly by-election in Banaskantha
- Progress update of Vadodara - Dahod - MP Border section of Delhi-Mumbai Expressway
- Thaltej Gam Metro Station ready; likely to open in December 2024
- Over 5 lakh tourists visit Rani ki Vav in Gujarat in two years
- Vav Assembly seat by-election 2024 live results