Standing committee of SMC approves Rs 174.22 crore tender for Dumas Sea Face project
August 04, 2023
Surat: Surat Municipal Corporation (SMC) standing committee approved a tender of Rs 174.22 crore for phase 1 of the Dumas Sea Phase Development project.
Dummas sea phase development project will be developed on the Marine theme. SMC had estimated a cost of Rs 137.72 crore for the project. However, the cost of the tender with operation and maintenance for 5 years was 25.51 percent higher than the estimation, which was Rs 174.22 crore.
Phase 1 of the project will include a multilevel mechanized car parking building. It will also have a kid’s play area across 7000 square meters. It will have a 1-km long cycle track and a 1-km long walkway based on a marine theme. It will have 9 sculptures of various types. It will also have an urban beach across 3800 square meters. DeshGujarat
Related Stories
Dumas Sea Face Development Project 30% complete; Likely to open by May 2025
Work on Dumas Sea Face Development Project set to commence on December 24
SMC to develop 107-hectare ecotourism park under Dumas sea-face project
Meeting held for Dumas Sea Front Development Project
Recent Stories
- Stray bull attacks man in Bhachau, Kutch; CCTV footage surfaces
- In pictures: Upcoming Five-Star Hyatt Hotel at GIFT City, Gujarat
- Ahmedabad girl jumps from building after being blackmailed with intimate video; two booked
- Gujarat gets widespread rain on Saturday; Dwarka tops with 4.45 inches
- No RTO visit needed: Gujarat launches faceless learning license system
- Western Railway announces block on July 6; several Gujarat-passing trains to be affected
- IMD forecasts heavy rains in these parts of Gujarat till July 11 | Weather | मौसम | હવામાન