Platform No. 4 at Surat Railway Station shuts for 3 months from today; Helpline numbers announced

Surat: Western Railways is carrying out Phase 1 Redevelopment of Surat Station from 10th June 2024 to 7th September 2024 (90 Days). During this period, Platform No. 4 will be closed for passenger traffic starting today.

As a result, 8 trains will originate from Udhna Station instead of Surat Station, and 9 trains will be terminated at Udhna Station instead of Surat Station. Udhna Station is located 4 km away from Surat Station and is well connected by road.

To assist passengers with train updates during the redevelopment work and changes in train stations, Western Railways has issued the following helpline numbers:

Surat: 0261240179
Udhna: 02267641801

Here are the details of the trains:

Image

Image

Platform number 4 will be closed from 10th June for a period of 90 days to facilitate the construction of a concourse area above it. The proposed concourse area is intended to include a restaurant and waiting area. Trains will continue to operate on platform numbers 1, 2, and 3 at Surat railway station.

Once the new railway station is constructed and operational, passengers will be required to wait in the concourse area and will only be allowed to access the railway platform 10-15 minutes before the scheduled arrival of their train.

Additionally, a new ticket window has been opened on the Varachha side, and arrangements have been made for smooth direct access to platforms 3, 2, and 1.

Here is the timetable issued by Western Railways for the arrival and departure of trains at Udhna Station.

Image

Image