AUDA to Relocate Entire Lake in Godhavi Village for Road Project
April 15, 2025
Ahmedabad: In a one-of-a-kind move, an entire lake in Godhavi village will be relocated to facilitate the construction of a crucial 45-metre-wide road connecting to the Dedicated Freight Corridor (DFC).
This 45-meter-wide Shela-Sanand connector road, part of the long-term development plan of the Ahmedabad Urban Development Authority (AUDA), was initially designed to curve around Mama Talavadi (a local lake), but will now pass directly through it due to a conflict with an existing DFC culvert.
AUDA officials explained that the culvert built in Godhavi was not compatible with the original road alignment, prompting the change. The lake, covering 4,000 sq m, will be shifted to a new location of equivalent size. Approved in a board meeting on April 9, the revised road plan passes through Godhavi, Nidhard, and Sanand, covering areas under TP Schemes, including Shela (TP-1), Ghuma (TP-3), and Nidhard (TP-10). The realignment will also require changes in land use in Godhavi’s TP Scheme 437, with certain plots reverting to agricultural zoning and others being newly designated for development. The AUDA chairman has been authorized to implement and oversee these adjustments. DeshGujarat
Recent Stories
- Japan to give E5, E3 Shinkansen bullet trains for free to India in early 2026: Report
- Narmada Uttarvahini Parikrama: Govt Announces Corrective Measures for Next Weekend's Rush
- Church on school campus in Tapi village sparks row
- Rahul Gandhi in Gujarat addresses orientation program for district observers; To kicks off 'Sangathan Sirjan Abhiyan'
- Jalaram Parotha House in Paldi among 5 food units sealed in AMC crackdown
- IndiGo inaugurates its new office in GIFT City, Gujarat
- EAM Jaishankar Gujarat visit Day 2: Opens gymnasium, inspects PSK